|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/17/2023 Measured TD: 20709 ft. Vertical TD: 7782 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/17/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/5/2025 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 66W | Footage: 677 FNL 975 FEL | | Bottom Hole Location: | Sec:27 Twp: 1S 66W | Footage: 682 FNL 300 FWL | | Proposed Depth/Form: | 20754 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: 407-3459 , Unit Acreage: 2560, Drill Unit: T1S R66W: Sec 26, 27 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1593 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1593 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20754 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2805, Top: , Bottom: 20754 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/1/2023 | | Spud Date: | 7/13/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 20709 ft. | Measured PB depth: | 20707 ft. | | True Vertical TD: | 7782 ft. | True Vertical PB depth: | 7782 ft. | | Top PZ Location: | Sec:26 Twp: 1S 66W | Footage: 677 FNL 975 FEL | | Bottom Hole Location: | Sec:27 Twp: 1S 66W | Footage: 682 FNL 300 FWL | | Log Types: | NO LOGS RAN | | Log Types: | CBL, MWD/LWD, (Resistivity on 001-10027). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 53 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1593 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1593 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20707 ft., Weight: P110 , Citings Type: ACTUAL | | Cement: | Sacks: 3195, Top: 0 ft., Bottom: 20707 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 5129 ft. | | N | N | | SUSSEX | 5883 ft. | | N | N | | SHANNON | 6973 ft. | | N | N | | SHARON SPRINGS | 9772 ft. | | N | N | | NIOBRARA | 9787 ft. | | N | N | | FORT HAYS | 10431 ft. | | | | | CODELL | 10505 ft. | | | | | CARLILE | 18145 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 8/13/2024 Interval Top: 18157 ft. Interval Bottom: 18310 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/2/2023 | Treatment End Date: | 5/14/2023 | | Treatment Summary: |
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 18157 ft. | # Of Holes: | 58 | | Interval Bottom: | 18310 ft. | Hole Size: | 0.36 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 8/13/2024 Interval Top: 14990 ft. Interval Bottom: 20640 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/2/2023 | Treatment End Date: | 5/14/2023 | | Treatment Summary: | Fort Hays Perforated Intervals: 14990'-15146'; 16763'-16835'; 17511'-17557'; 20604'-20640'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 14990 ft. | # Of Holes: | 154 | | Interval Bottom: | 20640 ft. | Hole Size: | 0.36 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 7/17/2023 Interval Top: 11424 ft. Interval Bottom: 20640 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/2/2023 | Treatment End Date: | 5/14/2023 | | Treatment Summary: | Frac'd Carlile-Codell-Fort Hays with 50 stage plug and perf:
9265209 total lbs proppant pumped: 5890663 lbs 40/70 mesh and 3374546 lbs 100 mesh;
261905 total bbls fluid pumped: 235708 bbls gelled fluid, 26149 bbls fresh water, and 48 bbls 15% HCl acid. | | Total fluid used in treatment (bbls): | 261905 | Max pressure during treatment (psi): | 8700 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 26149 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9265209 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10020 ft. | | Tubing Packer Depth: | 10018 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/17/2023 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 414 | | BBLS_OIL | 335 | | BTU_GAS | 1300 | | CALC_BBLS_H2O | 414 | | CALC_BBLS_OIL | 335 | | CALC_GOR | 1173 | | CALC_MCF_GAS | 393 | | CASING_PRESS | 604 | | GRAVITY_OIL | 40 | | MCF_GAS | 393 | | TUBING_PRESS | 1588 |
| | Perforation Data: | | Interval Top: | 11424 ft. | # Of Holes: | 2681 | | Interval Bottom: | 20640 ft. | Hole Size: | 0.36 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/13/2024 Interval Top: 11424 ft. Interval Bottom: 20594 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/2/2023 | Treatment End Date: | 5/14/2023 | | Treatment Summary: | Codell Perforated Intervals: 11424'-14976'; 15161'-16750'; 16849'-17498'; 17571'-18138'; 18324'-20594'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 11424 ft. | # Of Holes: | 2469 | | Interval Bottom: | 20594 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 22446 |
| Total Gas Produced (MCF) | 37153 |
| GOR | 1655 |
| GOR Determination | BOE |
| Average BOE per Day | 78.816 |
| Average MCFE per Day | 457.142 |
| Federal Financial Assurance | i | |
|
|