Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09958
Well Classification: OW Status: PR - 11/25/2024
Well Name/No:Seltzer LD #21-040HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/25/2024
FacilityID:447388LocationID:320515
County:ADAMS #001Location:NWNE 4 1S67W 6
Field:WATTENBERG - #90750Elevation:5142 ft.
Planned Location:348FNL  2250 FELLat/Long: 39.999401 / -104.892419Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999401 / -104.892419Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/6/2022
End Date: 4/26/2022
Reported: 5/3/2022
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/25/2024             Measured TD: 22487 ft.    Vertical TD: 7609 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/25/2024
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:9/24/2020
Proposed Top PZ Location:Sec:4 Twp: 1S 67W Footage: 600 FNL  16 FEL
Bottom Hole Location:Sec:21 Twp: 1S 67W Footage: 824 FNL  16 FEL
Proposed Depth/Form:24263 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3234 , Unit Acreage: 1040, Drill Unit: 3:W2W2,4:E2E2,9:E2E2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2050 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 938, Top: 0 ft., Bottom: 2051 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24363 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3627, Top: 2500 ft., Bottom: 24363 ft.

Wellbore Completed
Completion Date:11/26/2021
Spud Date:3/27/2020Spud Date Is:ACTUAL
Measured TD:22487 ft.Measured PB depth:22275 ft.
True Vertical TD:7609 ft.True Vertical PB depth:7607 ft.
Top PZ Location:Sec:04 Twp: 1S 67WFootage: 600 FNL  29 FEL
Bottom Hole Location:Sec:16 Twp: 1S 67WFootage: 828 FSL  28 FEL
Log Types:
Log Types:Mud, MWD/LWD, CBL (Composite in 001-09962)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2051 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 0 ft., Bottom: 2051 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 22280 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2485, Top: 2132 ft., Bottom: 22280 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 22280 ft., Depth: 22487 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN4708 ft.4918 ft.NN
SUSSEX5070 ft.5321 ft.NN
SHANNON5765 ft.5915 ft.NN
SHARON SPRINGS7798 ft.NN
NIOBRARA7980 ft.NN

Formation NB-SR                   Formation Classification:  OW                   Status:  CM - 6/2/2022                  Interval Top: 8408 ft.    Interval Bottom: 22280 ft.

 Completed Information for Formation NIOBRARA-SHARON SPRINGS
1st Production Date:5/29/2022Choke Size: 
Formation Name:NIOBRARA-SHARON SPRINGSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/6/2022Treatment End Date:4/26/2022
Treatment Summary:4181 bbls 15% HCL Acid; 2,076,025 # 100 Mesh Sand; 2,509,294 # 20/40 Mesh Sand; 6,514,726 # 40/70 Mesh Sand; 2,172,309 # 30/50 Mesh Sand; 453,469 bbls Slickwater Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):457650Max pressure during treatment (psi):4950
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):4181Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29617
Fresh water used in treatment (bbls):453469Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13272354Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8065 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/2/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 572
BBLS_OIL 379
BTU_GAS 1409
CALC_BBLS_H2O 572
CALC_BBLS_OIL 379
CALC_GOR 892
CALC_MCF_GAS 338
CASING_PRESS 2128
GRAVITY_OIL 44
MCF_GAS 338
TUBING_PRESS 1544
Perforation Data:
Interval Top:8408 ft.# Of Holes:1836
Interval Bottom:22280 ft.Hole Size:0.32 in.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/25/2024                Interval Top: 8408 ft.    Interval Bottom: 22059 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/6/2022Treatment End Date:4/26/2022
Treatment Summary:8408-22059
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8408 ft.# Of Holes:1836
Interval Bottom:22059 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)33475
Total Gas Produced (MCF)226703
GOR6772
GOR DeterminationBOE
Average BOE per Day198.781
Average MCFE per Day1152.931

 Federal Financial Assurance  i 

 Tribal Well  i No