Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09949
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Rio LC #12-363HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:446020LocationID:320491
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:398FNL  156 FWLLat/Long: 39.999248 / -104.939778Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999248 / -104.939779Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/25/2019
End Date: 10/14/2019
Reported: 11/1/2019
Days to report: 18
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 17801 ft.    Vertical TD: 7771 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 723 FNL  789 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 236 FSL  694 FEL
Proposed Depth/Form:17728 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17728 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1773, Top: , Bottom: 17728 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7041 ft., Depth: 12277 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/13/2019
Spud Date:6/29/2019Spud Date Is:ACTUAL
Measured TD:17801 ft.Measured PB depth:17792 ft.
True Vertical TD:7771 ft.True Vertical PB depth:7771 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 723 FNL  789 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 236 FSL  694 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API# 001-09950)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1760 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1760 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17801 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2448, Top: 4110 ft., Bottom: 17801 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4438 ft.4573 ft.NN
SUSSEX4806 ft.4970 ft.NN
SHANNON5411 ft.5481 ft.NN
SHARON SPRINGS7621 ft.NN
NIOBRARA7646 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8414 ft.    Interval Bottom: 17517 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/25/2019Treatment End Date:10/14/2019
Treatment Summary:1902 bbls 15% HCL Acid; 753,889# 100 Mesh Sand; 8,371,390 # 20/40 Sand; 218,676 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):220578Max pressure during treatment (psi):4726
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):1902Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):23849
Fresh water used in treatment (bbls):218676Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9125279Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7932 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 907
BBLS_OIL 538
BTU_GAS 1387
CALC_BBLS_H2O 907
CALC_BBLS_OIL 538
CALC_GOR 1251
CALC_MCF_GAS 673
CASING_PRESS 1383
GRAVITY_OIL 45
MCF_GAS 673
TUBING_PRESS 2135
Perforation Data:
Interval Top:8414 ft.# Of Holes:1586
Interval Bottom:17517 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9040
Total Gas Produced (MCF)82190
GOR9091
GOR DeterminationBOE
Average BOE per Day63.253
Average MCFE per Day366.880

 Federal Financial Assurance  i 

 Tribal Well  i No