Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09911
Well Classification: OW Status: PR - 9/26/2021
Well Name/No:Ivey LC #26-363HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/26/2021
FacilityID:444015LocationID:442411
County:ADAMS #001Location:SWSE 11 1S68W 6
Field:WATTENBERG - #90750Elevation:5107 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1091FSL  1725 FELLat/Long: 39.975019 / -104.965576Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.975016 / -104.965577Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/30/2021
End Date: 8/30/2021
Reported: 9/13/2021
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/26/2021             Measured TD: 23680 ft.    Vertical TD: 7937 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/26/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/9/2022
Proposed Top PZ Location:Sec:14 Twp: 1S 68W Footage: 460 FNL  927 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68W Footage: 286 FSL  912 FEL
Proposed Depth/Form:23506 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1904 , Unit Acreage: 960, Drill Unit: Sec 14, 23 & 26:E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1904 , Unit Acreage: 960, Drill Unit: Sec. 14, 23, 26: E2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23506 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3203, Top: , Bottom: 23506 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7186 ft., Depth: 15730 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/5/2021
Spud Date:12/17/2020Spud Date Is:ACTUAL
Measured TD:23680 ft.Measured PB depth:23675 ft.
True Vertical TD:7937 ft.True Vertical PB depth:7937 ft.
Top PZ Location:Sec:14 Twp: 1S 68WFootage: 460 FNL  927 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68WFootage: 286 FSL  912 FEL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-09900)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2024 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 895, Top: 0 ft., Bottom: 2024 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23680 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3295, Top: 3730 ft., Bottom: 23680 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4490 ft.4646 ft.NN
SUSSEX4817 ft.5007 ft.NN
SHANNON5280 ft.5346 ft.NN
SHARON SPRINGS7639 ft.NN
NIOBRARA7842 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/26/2021                 Interval Top: 8641 ft.    Interval Bottom: 23494 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/22/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/30/2021Treatment End Date:8/30/2021
Treatment Summary:2226 bbls 15% HCL Acid & 1583 bbls 7.5%; 886,508 # 100 Mesh Sand; 10,163,530 # 20/40 Sand; 285,140 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):288949Max pressure during treatment (psi):4553
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):3809Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):36936
Fresh water used in treatment (bbls):285140Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11050038Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8198 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/26/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 698
BBLS_OIL 315
BTU_GAS 1398
CALC_BBLS_H2O 698
CALC_BBLS_OIL 315
CALC_GOR 1829
CALC_MCF_GAS 576
CASING_PRESS 2838
GRAVITY_OIL 45
MCF_GAS 576
TUBING_PRESS 2015
Perforation Data:
Interval Top:8641 ft.# Of Holes:1486
Interval Bottom:23494 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)6486
Total Gas Produced (MCF)131058
GOR20206
GOR DeterminationMCFE
Average BOE per Day79.692
Average MCFE per Day462.262

 Federal Financial Assurance  i 

 Tribal Well  i No