|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2019 Measured TD: 18087 ft. Vertical TD: 7824 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/28/2017 | Proposed Top PZ Location: | Sec:25 Twp: 1S 67W | Footage: 460 FNL 710 FEL | Bottom Hole Location: | Sec:36 Twp: 1S 67W | Footage: 460 FSL 710 FEL | Proposed Depth/Form: | 12250 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1797 , Unit Acreage: 1280, Drill Unit: Sec. 25 & 36: ALL | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 509, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17952 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2435, Top: , Bottom: 17952 ft. |
| | |
Wellbore Completed | Completion Date: | 5/18/2017 | Spud Date: | 4/17/2017 | Spud Date Is: | ACTUAL | Measured TD: | 18087 ft. | Measured PB depth: | 18011 ft. | True Vertical TD: | 7824 ft. | True Vertical PB depth: | 7825 ft. | Top PZ Location: | Sec:25 Twp: 1S 67W | Footage: 510 FNL 638 FEL | Bottom Hole Location: | Sec:36 Twp: 1S 67W | Footage: 348 S 616 E | Log Types: | MWD, Resistivity, CBL | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1520 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 505, Top: 0 ft., Bottom: 1520 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18061 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2610, Top: 0 ft., Bottom: 18061 ft., Determination Method: VISU | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 925 ft. | 1130 ft. | | | SUSSEX | 5031 ft. | 5339 ft. | | | SHARON SPRINGS | 7303 ft. | | | | NIOBRARA | 7336 ft. | | | | FORT HAYS | 7740 ft. | | | | CODELL | 7764 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 6/11/2018 Interval Top: 10907 ft. Interval Bottom: 13252 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | 8/18/2017 | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/24/2017 | Treatment End Date: | 6/6/2017 | Treatment Summary: | Fort Hays: 13,252-12,867', 12,272-11,957', 11,082-10,907'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 10907 ft. | # Of Holes: | 150 | Interval Bottom: | 13252 ft. | Hole Size: | 0.4 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 4/1/2019 Interval Top: 8352 ft. Interval Bottom: 17959 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 8/18/2017 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/24/2017 | Treatment End Date: | 6/6/2017 | Treatment Summary: | Well was stimulated with 430,506 bbls of fluid: 202 bbls 7.5% HCl and 428415 bbls water; placed 9,554,230# 40/70, 7,678,420# 30/50, 1,450# DVA-23Diverter @AR 81 BPM, MR 94 BPM, AP 6,713 psi, MP 8,253 psi. | Total fluid used in treatment (bbls): | 430506 | Max pressure during treatment (psi): | 8253 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 55 | Total acid used in treatment (bbls): | 202 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 9042 | Fresh water used in treatment (bbls): | 428415 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 17234100 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7885 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/20/2017 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 482 | BBLS_OIL | 37 | BTU_GAS | 1450 | CALC_BBLS_H2O | 482 | CALC_BBLS_OIL | 37 | CALC_GOR | 448 | CALC_MCF_GAS | 16 | CASING_PRESS | 2000 | GRAVITY_OIL | 41 | MCF_GAS | 16 | TUBING_PRESS | 1800 |
| Perforation Data: | Interval Top: | 8352 ft. | # Of Holes: | 1620 | Interval Bottom: | 17959 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/11/2018 Interval Top: 8352 ft. Interval Bottom: 17959 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/18/2017 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/24/2017 | Treatment End Date: | 6/6/2017 | Treatment Summary: | Codell: 18,011-13,252', 12,867-12,272', 11,957-11,082', 10,907-8,352'. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8352 ft. | # Of Holes: | 1470 | Interval Bottom: | 17959 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 15020 |
Total Gas Produced (MCF) | 47885 |
GOR | 3188 |
GOR Determination | BOE |
Average BOE per Day | 63.501 |
Average MCFE per Day | 368.304 |
Federal Financial Assurance | i | |
|
|