|
|
|
|
Wellbore #00 Wellbore Classification: Status: AB - 1/4/2024 Measured TD: 8273 ft. Wellbore Data for Original Wellbore | Wellbore Classification: AB - 1/4/2024 | Wellbore Permit | | Permit #: | | Expiration Date: | 11/9/2014 | Proposed Top PZ Location: | Sec:28 Twp: 3S 64W | Footage: 409 FNL 1141 FWL | Bottom Hole Location: | Sec:28 Twp: 3S 64W | Footage: 409 FNL 1141 FWL | Proposed Depth/Form: | 8246 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-170 , Unit Acreage: 640, Drill Unit: ALL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1910 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1910 ft. | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1910 ft., Depth: 8246 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 924, Top: 6624 ft., Bottom: 8246 ft. |
| | |
Wellbore Completed | Completion Date: | 12/7/2012 | Spud Date: | 12/5/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8273 ft. | Measured PB depth: | 3000 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:28 Twp: 3S 64W | Footage: 409 FNL 1141 FWL | Bottom Hole Location: | Sec:28 Twp: 3S 64W | Footage: 409 N 1141 W | Log Types: | MWD, CBL, Array Induction w/ Linear Correlation, Open Hole Triple Combo | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 8, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3016 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 893, Top: 0 ft., Bottom: 3016 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 3016 ft., Depth: 8273 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: OPEN HOLE , Top: 3000 ft., Depth: , Bottom: 8251 ft., Sacks: 599, Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 5278 ft. | 5534 ft. | N | N | SUSSEX | 5804 ft. | 6048 ft. | N | N | SHARON SPRINGS | 7222 ft. | 7373 ft. | N | N | NIOBRARA | 7373 ft. | 7766 ft. | N | N | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: AB - 1/4/2024 Measured TD: 11431 ft. Vertical TD: 7551 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW AB - 1/4/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/9/2014 | Proposed Top PZ Location: | Sec:28 Twp: 3S 64W | Footage: 646 FNL 695 FWL | Bottom Hole Location: | Sec:28 Twp: 3S 64W | Footage: 647 FNL 651 FEL | Proposed Depth/Form: | 11843 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-170 , Unit Acreage: 640, Drill Unit: ALL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1910 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1910 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7605 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 773, Top: 1910 ft., Bottom: 7605 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 6800 ft., Depth: 11843 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 1/2/2013 | Spud Date: | 12/5/2012 | Spud Date Is: | ACTUAL | Measured TD: | 11431 ft. | Measured PB depth: | 11363 ft. | True Vertical TD: | 7551 ft. | True Vertical PB depth: | 7554 ft. | Top PZ Location: | Sec:28 Twp: 3S 64W | Footage: 646 FNL 695 FWL | Bottom Hole Location: | Sec:28 Twp: 3S 64W | Footage: 647 N 651 E | Log Types: | CBL, TCombo, FMI, GR | Log Types: | MWD, CBL, Caliper | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 8, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3016 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 893, Top: 0 ft., Bottom: 3016 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7519 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 498, Top: 2535 ft., Bottom: 7519 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7071 ft., Depth: 11413 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 5278 ft. | 5534 ft. | N | N | SUSSEX | 5804 ft. | 6048 ft. | N | N | SHARON SPRINGS | 7222 ft. | 7373 ft. | N | N | NIOBRARA | 7373 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: AB - 1/4/2024 Interval Top: 7519 ft. Interval Bottom: 11431 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/9/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/25/2013 | Treatment End Date: | 1/28/2013 | Treatment Summary: | Fracture stimulated through a 14 stage port and packer system with 2,906,132 lbs of sand and 73,024 bbls of fresh water. | Total fluid used in treatment (bbls): | 73024 | Max pressure during treatment (psi): | 6799 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 14 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.81 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 23367 | Fresh water used in treatment (bbls): | 73024 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 2906132 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7130 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/22/2013 | Test Method: | | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 466 | BBLS_OIL | 168 | BTU_GAS | 1350 | CALC_BBLS_H2O | 466 | CALC_BBLS_OIL | 168 | CALC_GOR | 1684 | CALC_MCF_GAS | 283 | CASING_PRESS | 120 | GRAVITY_OIL | 37 | MCF_GAS | 283 | TUBING_PRESS | 1900 |
| Perforation Data: | Interval Top: | 7519 ft. | # Of Holes: | | Interval Bottom: | 11431 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 01/04/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|