Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09718
Well Classification: OW Status: PA - 6/17/2020
Well Name/No:JOSEPH J.C. PAINE #NO. 1 ANADARKO
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PAINE* JOSEPH J.C. DBA PAINE PETROLEUM COMPANY LLC - 10317
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/17/2020
FacilityID:414619LocationID:414601
Municipality/County:AURORA / ADAMS #001Location:SENE 7 3S65W 6
Field:SECOND CREEK - #76900Elevation:5376 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  600 FELLat/Long: 39.807520 / -104.699060Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.807524 / -104.699059Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/17/2020             Measured TD: 8501 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/17/2020
Wellbore Permit
Permit #: Expiration Date:11/23/2011
Proposed Depth/Form:8500 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/10/2009
Spud Date:12/6/2009Spud Date Is:ACTUAL
Measured TD:8501 ft.Measured PB depth:8442 ft.
True Vertical TD:True Vertical PB depth:
Log Types:MUD, CD/CN/ML, DIL, CBL
Casing:String Type: SURF, Hole Size: 12.75 in., Size: 8.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 1300, Top: 0 ft., Bottom: 1830 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8501 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6850 ft., Bottom: 8501 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5240 ft.5348 ft.NN
NIOBRARA7575 ft.NN
FORT HAYS7904 ft.NN
CODELL7952 ft.NN
GREENHORN8000 ft.NN
D SAND8296 ft.8326 ft.NN
J SAND8348 ft.8437 ft.NN
SKULL CREEK8437 ft.NN

Formation DSND                     Formation Classification:  GW                     Status:  AB - 6/17/2020                 Interval Top: 8306 ft.    Interval Bottom: 8320 ft.

 Completed Information for Formation D SAND
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:D SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2009
Treatment Summary:33000 GAL. GEL, 51,000 20/40 SAND
Tubing Size:2.875 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/13/2010Test Method:PUMP
Hours Tested:12Gas Type:WET
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 8
CALC_GOR 667
CASING_PRESS 340
GRAVITY_OIL 40
TUBING_PRESS 470
Perforation Data:
Interval Top:8306 ft.# Of Holes:56
Interval Bottom:8320 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/17/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No