Wellbore #00 Wellbore Classification: STOW Status: SI - 1/18/2011 Measured TD: 8923 ft. Vertical TD: 7279 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: STOW SI - 1/18/2011 | | Wellbore Permit | HORIZONTAL | | Permit #: | 20092043 | Expiration Date: | 7/6/2011 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1910 FNL 2290 FWL | | Bottom Hole Location: | Sec:17 Twp: 2S 62W | Footage: 1500 FSL 2400 FEL | | Proposed Depth/Form: | 9615 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: , Depth: 1110 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 399, Top: 0 ft., Bottom: 1110 ft. | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: , Depth: 7615 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 495, Top: 5100 ft., Bottom: 7615 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 815, Top: 0 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/9/2010 | | Spud Date: | 6/28/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8923 ft. | Measured PB depth: | 8923 ft. | | True Vertical TD: | 7279 ft. | True Vertical PB depth: | 7279 ft. | | Top PZ Location: | Sec:17 Twp: 2S 62W | Footage: 1923 FNL 2459 FWL | | Bottom Hole Location: | Sec:17 Twp: 2S 62W | Footage: 2051 FSL 2484 FEL | | Log Types: | ISOLATION SCANNER - CEMENT BOND LOG | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1138 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 626, Top: 0 ft., Bottom: 1138 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: 7640 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 5150 ft., Bottom: 7640 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6485 ft., Depth: 8909 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Additional Cement: | String Type: S.C. 1.1 , Top: 335 ft., Depth: 5110 ft., Bottom: 5110 ft., Sacks: 990, Method: STAGE TOOL | | Additional Cement: | String Type: S.C. 1.2 , Top: 94 ft., Depth: 180 ft., Bottom: 195 ft., Sacks: 70, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 7343 ft. | 7398 ft. | | | | J SAND | 7559 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 1/18/2011 Interval Top: 7559 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | 5.5 in. | Tubing Setting Depth: | 6470 ft. | | Tubing Packer Depth: | 6470 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|