Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09681
Well Classification: STOW Status: AC - 11/4/2008
Well Name/No:TOTEM #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:COLORADO INTERSTATE GAS COMPANY LLC - 18600
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:ACStatus Date11/4/2008
FacilityID:299469LocationID:320622
County:ADAMS #001Location:NWNE 8 2S62W 6
Field:TOTEM - #83000Elevation:5164 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FNL  1980 FELLat/Long: 39.895210 / -104.345200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.895210 / -104.345200Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: STOW             Status: AC - 7/25/2008             Measured TD: 7400 ft.

 Wellbore Data for Original WellboreWellbore Classification: STOW        AC - 7/25/2008
Wellbore Permit
Permit #:20085029 Expiration Date:11/3/2009
Proposed Depth/Form:7400 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 110, Top: 0 ft., Bottom: 51 ft.

Wellbore Completed
Completion Date:1/3/2009
Spud Date:12/27/2008Spud Date Is:ACTUAL
Measured TD:7400 ft.Measured PB depth:7354 ft.
True Vertical TD:True Vertical PB depth:
Log Types:TRIPLE COMBO, CBL, MICROLOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1156 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 615, Top: 0 ft., Bottom: 1156 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7399 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 7399 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
D SAND7178 ft.7194 ft.NN
J SAND7234 ft.7271 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AC - 7/25/2008                 Interval Top: 7236 ft.    Interval Bottom: 7246 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2009
Treatment Summary:GAS STORAGE USE
Tubing Size:2.875 in.Tubing Setting Depth:7211 ft.
Tubing Packer Depth:7211 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7236 ft.# Of Holes:40
Interval Bottom:7246 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No