|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2024 Measured TD: 8925 ft. Vertical TD: 8705 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20050041 | Expiration Date: | 1/13/2006 | Proposed Top PZ Location: | Sec:2 Twp: 15 68W | Footage: 1875 FNL 595 FWL | Bottom Hole Location: | Sec:2 Twp: 15 68W | Footage: 1875 FNL 595 FWL | Proposed Depth/Form: | 8708 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NW | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 150, Top: 4635 ft., Bottom: 4950 ft. |
| | |
Wellbore Completed | Completion Date: | 7/10/2005 | Spud Date: | 6/30/2005 | Spud Date Is: | ACTUAL | Measured TD: | 8925 ft. | Measured PB depth: | 8892 ft. | True Vertical TD: | 8705 ft. | True Vertical PB depth: | 8672 ft. | Top PZ Location: | Sec:2 Twp: 15 68W | Footage: 1875 FNL 595 FWL | Bottom Hole Location: | Sec:2 Twp: 15 68W | Footage: 1875 N 595 W | Log Types: | CDL/CNL/GR, GR/CCL/CBL, DIL/GL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1120 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1120 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8910 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 7300 ft., Bottom: 8910 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5748 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 4350 ft., Bottom: 5748 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4979 ft. | | N | N | NIOBRARA | 7765 ft. | | N | N | CODELL | 8239 ft. | | N | N | J SAND | 8652 ft. | | N | N | DAKOTA | 8824 ft. | | N | N |
Formation DKTA Formation Classification: OW Status: SI - 3/1/2024 Interval Top: 8848 ft. Interval Bottom: 8852 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 12/24/2005 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/19/2005 | Treatment Summary: | FRAC WITH 14,700 LBS SAND & 454 BBL GELLED WATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 8848 ft. | # Of Holes: | 16 | Interval Bottom: | 8852 ft. | Hole Size: | 0.42 in. |
|
Formation DKNCD Formation Classification: OW Status: CM - 7/14/2009 Interval Top: 7804 ft. Interval Bottom: 8852 ft. Completed Information for Formation DAKOTA-CODELL-NIOBRARA | 1st Production Date: | 9/1/2005 | Choke Size: | 0.750 in. | Formation Name: | DAKOTA-CODELL-NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2005 | Treatment Summary: | DAKOTA: 14,700# SAND AND 454 BBL GELLED WATER. CODELL: 247,000# SAND AND 3236 BBL GELLED WATER. NIOBRARA: 245,000# SAND AND 4280 BBL GELLED WATER |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8800 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/15/2005 | Test Method: | GAGUE | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | VENTED | |
Test Type | Measure |
---|
BBLS_H2O | 400 | BBLS_OIL | 130 | CALC_GOR | 5769 | CASING_PRESS | 650 | MCF_GAS | 750 |
| Perforation Data: | Interval Top: | 7804 ft. | # Of Holes: | 112 | Interval Bottom: | 8852 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 3/1/2024 Interval Top: 7804 ft. Interval Bottom: 8250 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/24/2005 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/30/2005 | Treatment Summary: | STAGE 1 -247,000 LBS SAND & 3,236 BBLS GELLED WATER. STAGE 2 - 245,000 LBS SAND & 4280 BBLS GELLED WATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7804 ft. | # Of Holes: | 96 | Interval Bottom: | 8250 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 3 |
Total Gas Produced (MCF) | 15 |
GOR | 5000 |
GOR Determination | BOE |
Average BOE per Day | 0.017 |
Average MCFE per Day | 0.092 |
Federal Financial Assurance | i | |
|
|