|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 6/19/2024 Measured TD: 8300 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/19/2024 | Wellbore Permit | | Permit #: | | Expiration Date: | 8/11/2004 | Proposed Depth/Form: | 8300 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407;407-66, Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232;318A , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407;407-66, Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1441 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1441 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8305 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 335, Top: 6500 ft., Bottom: 8305 ft. |
| | |
Wellbore Completed | Completion Date: | 7/10/2003 | Spud Date: | 6/23/2003 | Spud Date Is: | ACTUAL | Measured TD: | 8300 ft. | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, ARRAY INDUCTION, GR, CN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1441 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 525, Top: 0 ft., Bottom: 1441 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8305 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 335, Top: 6500 ft., Bottom: 8305 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4748 ft. | | N | N | NIOBRARA | 7121 ft. | | N | N | FORT HAYS | 7526 ft. | | N | N | CODELL | 7554 ft. | | N | N | GREENHORN | 7621 ft. | | N | N | GRANEROS | 7825 ft. | | N | N | D SAND | 7928 ft. | | N | N | MOWRY | 7975 ft. | | N | N | J SAND | 7986 ft. | | N | N | J-2 SAND | 8005 ft. | | N | N | SKULL CREEK | 8094 ft. | | N | N | DAKOTA | 8170 ft. | | N | N |
Formation LKTA Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 8226 ft. Interval Bottom: 8239 ft. Completed Information for Formation LAKOTA | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | LAKOTA | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2003 | Treatment Summary: | PERF THE LAKOTA FROM 8226'-8230' W/ 4 SPF. RIH W/ TBG & PKR. SET PKR @ 8200'. SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8200 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/23/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 0 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 199 | CASING_PRESS | 85 | MCF_GAS | 199 |
| Perforation Data: | Interval Top: | 8226 ft. | # Of Holes: | 16 | Interval Bottom: | 8239 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 7992 ft. Interval Bottom: 8036 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2003 | Treatment Summary: | REL PKR. POOH.SET CIBP 8200'. PERF'D THE J SAND F/7992'-7996',8018'-8020',8023'-8028',8035'- 8036' W/4 SPF. FRAC'D W/178,374 GAL SLICK WATER CONTAINING 124,788# 20/40 SAND. FLOW BACK WELL. RIGH W/PROD.TBG. LAND EOT@7977'. SWAB IN WELL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7977 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/10/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 1 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 1 | CALC_GOR | 112000 | CALC_MCF_GAS | 112 | CASING_PRESS | 85 | MCF_GAS | 112 |
| Perforation Data: | Interval Top: | 7992 ft. | # Of Holes: | 48 | Interval Bottom: | 8036 ft. | Hole Size: | 0.38 in. |
|
Formation GRRS Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 7880 ft. Interval Bottom: 7920 ft. Completed Information for Formation GRANEROS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | GRANEROS | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2003 | Treatment Summary: | SET CIBP @ 7980'. PLACE 1 SK OF CMT ON CIBP. SET SECONG CIBP@7960'. PLACE 1 SK OF CMT ON CIBP, PERF'D THE GRANEROS F/7880'-7920' W/SPF. FRAC'D W/227,350 GAL SLICK WATER W/68,380# 100-MESH&47,320# 20/40 SAND. FLOW BACK FRAC. RIH W/PROD.TBG. LAND EOT@7854' |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7854 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/14/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 0 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 1310 | MCF_GAS | 0 | TUBING_PRESS | 520 |
| Perforation Data: | Interval Top: | 7880 ft. | # Of Holes: | 160 | Interval Bottom: | 7920 ft. | Hole Size: | 0.32 in. |
|
Formation GRNHN Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 7728 ft. Interval Bottom: 7763 ft. Completed Information for Formation GREENHORN | 1st Production Date: | N/A | Choke Size: | | Formation Name: | GREENHORN | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2003 | Treatment Summary: | SET CIBP @ 7850'. PLACE 3/4 SK OF CMT ON PLUG. PERF'D THE GREENHORN FROM 7728' - 7763' W/4 SPF. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/16/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 0 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 13100 | MCF_GAS | 0 | TUBING_PRESS | 520 |
| Perforation Data: | Interval Top: | 7728 ft. | # Of Holes: | 140 | Interval Bottom: | 7763 ft. | Hole Size: | 0.35 in. |
|
Formation LKT-J Formation Classification: GW Status: CM - 12/27/2003 Interval Top: 7158 ft. Interval Bottom: 8230 ft. Completed Information for Formation LAKOTA - J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | LAKOTA - J SAND | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2003 | Treatment Summary: | DRILLED OUT CIBP'S. RIH W/PRODUCTION TBG. LAND EOT @ 7983'. SWAB. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7983 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/27/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 0 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 1 | CASING_PRESS | 1350 | MCF_GAS | 1 | TUBING_PRESS | 520 |
| Perforation Data: | Interval Top: | 7158 ft. | # Of Holes: | 620 | Interval Bottom: | 8230 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 7158 ft. Interval Bottom: 7380 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/10/2003 | Treatment Summary: | SET CIBP@7685'. DUMP 1 SX CMT ON CIBP. PERF'D THE NIOBRARA FROM 7348'-7380',7158'-7190' W/4 SPF. FRAC'D W/314,126 GAL SLICK WATER W/151,140# 20/40 SAND. RIH W/TBG. LAND TBG @ 7155'. SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7155 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/13/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 0 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 1310 | MCF_GAS | 0 | TUBING_PRESS | 520 |
| Perforation Data: | Interval Top: | 7158 ft. | # Of Holes: | 256 | Interval Bottom: | 7380 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 06/19/2024 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 12 |
Total Gas Produced (MCF) | 304 |
GOR | 25333 |
GOR Determination | MCFE |
Average BOE per Day | 0.179 |
Average MCFE per Day | 1.032 |
Federal Financial Assurance | i | |
|
|