|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/13/1998 Measured TD: 6616 ft. Vertical TD: 6616 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/13/1998 | | Wellbore Permit | | | Permit #: | 19980015 | Expiration Date: | 1/13/1999 | | Proposed Depth/Form: | 6575 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 640, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 3/25/1998 | | Spud Date: | 1/19/1998 | Spud Date Is: | ACTUAL | | Measured TD: | 6616 ft. | Measured PB depth: | 6595 ft. | | True Vertical TD: | 6616 ft. | True Vertical PB depth: | 6595 ft. | | Log Types: | DUAL IND. GUARD LOG AND COMPENSATED DENSITY/NEUTRON/GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 596 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 596 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6615 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 5740 ft., Bottom: 6615 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 5664 ft. | 6050 ft. | N | N | | FORT HAYS | 6050 ft. | 6082 ft. | N | N | | D SAND | 6428 ft. | 6512 ft. | N | N | | J SAND | 6518 ft. | 6570 ft. | N | N |
Formation JSND Formation Classification: OW Status: PR - 3/13/1998 Interval Top: 6518 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | No Perforation Data was found for formation JSND. |
|
Formation DJSND Formation Classification: OW Status: CM - 3/13/1998 Interval Top: 6471 ft. Interval Bottom: 6559 ft.| Completed Information for Formation D & J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | D & J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/25/1998 | | Treatment Summary: | J SND 6551'-6559' ACIDIZE W/500 GALS. 7-1/2% HCL. FRAC W/27,000 GALS. X-LINKS GEL W/50,000 # 20-/40 SAND. D SAND 6471'-6510' ACIDIZE W/1000 GALS . 7-1/2%HCL. FRAC W/17,000 GALS. X-LINK GEL W 30,000 # 20/40 SAND . |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6526 ft. | | Tubing Packer Depth: | 6495 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/1998 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 285 | | BTU_GAS | 1405 | | CALC_BBLS_OIL | 285 | | CALC_MCF_GAS | 190 | | GRAVITY_OIL | 40 | | MCF_GAS | 190 |
| | Perforation Data: | | Interval Top: | 6471 ft. | # Of Holes: | 72 | | Interval Bottom: | 6559 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: PR - 3/13/1998 Interval Top: 6428 ft. Interval Bottom: 6559 ft.| Completed Information for Formation D SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DSND. |
| | No Perforation Data was found for formation DSND. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1326 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 3.626 |
| Average MCFE per Day | 21.031 |
| Federal Financial Assurance | i | |
|
|