|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2018 Measured TD: 8176 ft. Vertical TD: 8176 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2018 | | Wellbore Permit | | | Permit #: | 19940303 | Expiration Date: | 9/7/1994 | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 10/13/1994 | | Spud Date: | 6/28/1994 | Spud Date Is: | ACTUAL | | Measured TD: | 8176 ft. | Measured PB depth: | 8139 ft. | | True Vertical TD: | 8176 ft. | True Vertical PB depth: | 8139 ft. | | Log Types: | DIL-SP-GR-CAL; CDL-CNL-GR; MINILOG-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 321 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8176 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 785, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7268 ft. | | | | | FORT HAYS | 7586 ft. | | | | | CODELL | 7617 ft. | | | | | CARLILE | 7626 ft. | | | | | GREENHORN | 7686 ft. | | | | | BENTONITE | 7882 ft. | | | | | D SAND | 7977 ft. | | | | | HUNTSMAN | 7992 ft. | | | | | J SAND | 8037 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 6/1/2018 Interval Top: 8041 ft. Interval Bottom: 8088 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/13/1994 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | GAS LIFT | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/1994 | | Treatment Summary: | SEE SCANNED DOCUMENT #00353436 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8039 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/2/1994 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 56000 | | CALC_MCF_GAS | 56 | | GRAVITY_OIL | 38 | | MCF_GAS | 56 |
| | Perforation Data: | | Interval Top: | 8041 ft. | # Of Holes: | 12 | | Interval Bottom: | 8088 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 05/13/2024 |
| Defined Inactive (SI) | Y | Last Production 05/31/2018 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|