|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: STOW Status: PA - 11/19/2021 Measured TD: 7374 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: STOW PA - 11/19/2021 | | Wellbore Permit | | | Permit #: | 841039 | Expiration Date: | 12/5/1984 | | Proposed Depth/Form: | 7386 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 8/2/1984 | Spud Date Is: | ACTUAL | | Measured TD: | 7374 ft. | Measured PB depth: | 7356 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | OPEN-HOLE LOGS SUPPLIED TO COGCC BY PREVIOUS OPERATOR. SEGMENTED CBL/GR/CCL | | Log Types: | DIFL, CDL, CN, GR, PROLOG, CEMENT BOND | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 252 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: , Bottom: 252 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7365 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6844 ft., Bottom: 7365 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1145 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: , Bottom: 1145 ft., Determination Method: | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1145 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 780 ft., Bottom: 1145 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6416 ft. | | N | N | | TIMPAS | 6777 ft. | | N | N | | CODELL | 6806 ft. | | N | N | | D SAND | 7151 ft. | 7171 ft. | N | N | | J SAND | 7208 ft. | 7242 ft. | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/19/2021 Interval Top: 7208 ft. Interval Bottom: 7216 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/10/1984 | | Treatment Summary: | 11/05/08 SQUEEZED EXISTING PERFS; 12/31/08 PUMPED CEMENT INTO EXISTING PERFS AND RE-PERFED 7208-7216; SQUEEZE PERF TICKET ATTACHED TO DOC#1705044 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7271 ft. | | Tubing Packer Depth: | 7188 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7208 ft. | # Of Holes: | 32 | | Interval Bottom: | 7216 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/19/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|