|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2025 Measured TD: 7733 ft. Vertical TD: 7733 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2025 | | Wellbore Permit | | | Permit #: | 19890732 | Expiration Date: | 1/4/1990 | | Proposed Depth/Form: | 7740 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SENW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: SENW |
| | |
| Wellbore Completed | | Completion Date: | 10/1/1989 | | Spud Date: | 8/27/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 7733 ft. | Measured PB depth: | 7677 ft. | | True Vertical TD: | 7733 ft. | True Vertical PB depth: | | | Log Types: | INDUCTION-SFL & COMP. FM. DENSITY W/G.R. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 207 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 0 ft., Bottom: 207 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7714 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7220 ft., Bottom: 7714 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 870 ft. | | | | | SUSSEX | 4610 ft. | | | | | NIOBRARA | 6792 ft. | | | | | FORT HAYS | 7110 ft. | | | | | CODELL | 7141 ft. | | | | | CARLILE | 7151 ft. | | | | | GREENHORN | 7200 ft. | | | | | BENTONITE | 7411 ft. | | | | | D SAND | 7515 ft. | | | | | J SAND | 7577 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 12/1/2025 Interval Top: 7578 ft. Interval Bottom: 7584 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/5/1989 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/1/1989 | | Treatment Summary: | SEE SCANNED DOCUMENT #00319055 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7490 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/10/1989 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 80 | | CASING_PRESS | 120 | | MCF_GAS | 80 | | TUBING_PRESS | 40 |
| | Perforation Data: | | Interval Top: | 7578 ft. | # Of Holes: | 24 | | Interval Bottom: | 7584 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: PR - 12/1/2025 Interval Top: 7515 ft. Interval Bottom: 7520 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 10/14/1989 | Choke Size: | 0.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/1/1989 | | Treatment Summary: | SEE SCANNED DOCUMENT #00319054 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7594 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/27/1982 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 35 | | CALC_GOR | 4571 | | GRAVITY_OIL | 39 | | MCF_GAS | 160 |
| | Perforation Data: | | Interval Top: | 7515 ft. | # Of Holes: | 10 | | Interval Bottom: | 7520 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 4 |
| Total Gas Produced (MCF) | 6 |
| GOR | 1500 |
| GOR Determination | BOE |
| Average BOE per Day | 0.014 |
| Average MCFE per Day | 0.081 |
| Federal Financial Assurance | i | |
|
|