COGIS - WELL SCOUT CARD
Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-08143
Well Classification: GW Status: PA - 8/7/2019
Well Name/No:NORTH COLORADO #6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/7/2019
FacilityID:202738LocationID:335731
Municipality/County:THORNTON / ADAMS #001Location:NENW 13 1S68W 6
Field:SPINDLE - #77900Elevation:5129 ft.
Planned Location:780FNL  1760 FWLLat/Long: 39.969879 / -104.953074Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.969710 / -104.952950Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/7/2019             Measured TD: 8763 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/7/2019
Wellbore Permit
Permit #:19820807 Expiration Date:9/7/1982
Prop Depth/Form:8500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NW4
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 160, Drill Unit: NW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: NENW

Wellbore Completed
Completion Date:N/A
Spud Date:5/3/1982Spud Date Is:ACTUAL
Measured TD:8763 ft.Measured PB depth:8588 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DILL, GR, CNR, FDC, SPECTROSCOPY
Log Types:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 276 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 276 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8709 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 6740 ft., Bottom: 8709 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5484 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 222, Top: 4480 ft., Bottom: 5484 ft., Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2245 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 575 ft., Bottom: 2245 ft., Determination Method: CBL
Casing:String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 80 ft., Bottom: 550 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND8458 ft.

Formation DKTA                     Formation Classification:  OW                     Status:  AB - 1/17/2001                 Interval Top: 8614 ft.    Interval Bottom: 8624 ft.

 Completed Information for Formation DAKOTA
1st Production Date:3/1/2000Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:FLOW - PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/1982
Treatment Summary:FRAC DAKOTA W/23,490# OF 20/40 SAND + 8000# OF 20/40 ACFRAC BLACK, 32,550 GALLONS OF PHOENIX GE @ 16-18 BPM - ISIP 4448
Tubing Size:2.375 in.Tubing Setting Depth:8546 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2000Test Method:FLOW
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BTU_GAS 1250
CASING_PRESS 335
MCF_GAS 2
TUBING_PRESS 210
Perforation Data:
Interval Top:8614 ft.# Of Holes:41
Interval Bottom:8624 ft.Hole Size:0.5 in.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 1/17/2001                 Interval Top: 8458 ft.    Interval Bottom: 8463 ft.

 Completed Information for Formation J SAND
1st Production Date:12/1/1984Choke Size: 
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:9/13/1982
Treatment Summary:120,000 GALS GWX-07 FLUSH KCL WATER 300,000 BBLS 20/40 MESH SAND W/4012 PSI.
Tubing Size:2.375 in.Tubing Setting Depth:8378 ft.
Tubing Packer Depth:8378 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/5/1982Test Method:FLOWING
Hours Tested:21Gas Type:
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 41.3
BBLS_OIL 13
CALC_GOR 39385
CALC_MCF_GAS 512
GRAVITY_OIL 56
TUBING_PRESS 625
Perforation Data:
Interval Top:8458 ft.# Of Holes:
Interval Bottom:8463 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/30/2008                 Interval Top: 8007 ft.    Interval Bottom: 8026 ft.

 Completed Information for Formation CODELL
1st Production Date:2/6/2001Choke Size:0.500 in.
Formation Name:CODELLCommingled:No
Production Method:PLUNGER LIFT
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/1982
Treatment Summary:APR 2004 FRACTURE STIMULATION: TIP SCREENOUT WITH ONLY 64K OTTAWA 20/40 DURING 3 PPG JOB. DISPLACED BUT HAD SAND BRIDGE IN TUBING. CODELL ZONE OPEN. RBP SET @ 8290' W/2 SX CMT CAP ISOLATING J SAND AND DAKOTA FORMATIONS.
Tubing Size:2.375 in.Tubing Setting Depth:7984 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2001Test Method:TEST SEPARATOR
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 149
BTU_GAS 1259
CALC_GOR 2248
CASING_PRESS 2000
GRAVITY_OIL 45
MCF_GAS 335
TUBING_PRESS 1000
Perforation Data:
Interval Top:8007 ft.# Of Holes:72
Interval Bottom:8026 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/7/2019                  Interval Top: 7612 ft.    Interval Bottom: 8026 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/1/2005Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:PLUNGER 500
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7612 ft.# Of Holes:243
Interval Bottom:8026 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/30/2008                 Interval Top: 7612 ft.    Interval Bottom: 7865 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/9/2004Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:9/13/1982
Treatment Summary:FRAC NIOBRARA FORMATION WITH 1,000 GALS 15% HCL AND 28,000 GALS FR WATER, SHUT DOWN, PACKER FAILURE. RE-FRAC WITH 39,000 GALS FR WATER, 93,550 GALS SILVERSTIM FLUID, 250,540 LBS 20/40 SAND, AIR 23.8 BPM, AIR 5,888 PSI, ISIP 3,888 PSI.
Tubing Size:2.375 in.Tubing Setting Depth:7589 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/2004Test Method:PUMP
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 15
BTU_GAS 1339
CALC_GOR 5867
CASING_PRESS 500
GRAVITY_OIL 44.3
MCF_GAS 88
TUBING_PRESS 400
Perforation Data:
Interval Top:7612 ft.# Of Holes:171
Interval Bottom:7865 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No