|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/19/2024 Measured TD: 8107 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/19/2024 | Wellbore Permit | | Permit #: | 19820525 | Expiration Date: | 10/21/1995 | Proposed Depth/Form: | 8107 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 316 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 316 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 6/24/1995 | Spud Date: | 4/13/1982 | Spud Date Is: | ACTUAL | Measured TD: | 8107 ft. | Measured PB depth: | 8064 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | INDUCTION/SFL; FDC/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 0 ft., Bottom: 240 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8112 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 7186 ft., Bottom: 8112 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5250 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 4625 ft., Bottom: 5250 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1400 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 360 ft., Bottom: 1400 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1195 ft. | | | | SUSSEX | 4715 ft. | | | | NIOBRARA | 7100 ft. | | | | D SAND | 7912 ft. | | | | J SAND | 7971 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 7974 ft. Interval Bottom: 8012 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/27/1982 | Choke Size: | 0.563 in. | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/24/1995 | Treatment Summary: | 20,000 GALS PREPAD; 30,000 PAD; 21,000# 100 MESH; 284,000# 20/40 SAND; 143,000 GAL VERSAGEL FLUSHED W/ 5200 GALS 2% KCL H2O; 27 TONS CO2; 1,000 GALS 7.5% NE ACID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/29/1982 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 6 | CALC_GOR | 63000 | GRAVITY_OIL | 47 | MCF_GAS | 378 |
| Perforation Data: | Interval Top: | 7974 ft. | # Of Holes: | 15 | Interval Bottom: | 8012 ft. | Hole Size: | 0.4 in. |
|
Formation DJSND Formation Classification: GW Status: CM - 3/31/2008 Interval Top: 7914 ft. Interval Bottom: 8012 ft. Completed Information for Formation D & J SAND | 1st Production Date: | 4/21/2003 | Choke Size: | | Formation Name: | D & J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/24/1995 | Treatment Summary: | RIH W/BAILER AND TBG. DRILL OUT CIBP, RIH W/PROD TBG. LAND TBG. SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7852 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/28/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 34 | CALC_GOR | 6794 | CASING_PRESS | 690 | MCF_GAS | 231 | TUBING_PRESS | 355 |
| Perforation Data: | Interval Top: | 7914 ft. | # Of Holes: | 31 | Interval Bottom: | 8012 ft. | Hole Size: | 0.38 in. |
|
Formation DSND Formation Classification: GW Status: AB - 6/19/2024 Interval Top: 7914 ft. Interval Bottom: 7918 ft. Completed Information for Formation D SAND | 1st Production Date: | 6/24/1995 | Choke Size: | | Formation Name: | D SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/24/1995 | Treatment Summary: | 243,000# 20/40 AC FRAC PR-BLK SD 17,304 GALS VIKING ID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/4/1995 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 95 | CALC_GOR | 1516 | CASING_PRESS | 770 | GRAVITY_OIL | 42.8 | MCF_GAS | 144 |
| Perforation Data: | Interval Top: | 7914 ft. | # Of Holes: | | Interval Bottom: | 7918 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: AB - 3/18/1995 Interval Top: 4952 ft. Interval Bottom: 4964 ft. Completed Information for Formation SUSSEX | 1st Production Date: | N/A | Choke Size: | | Formation Name: | SUSSEX | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SUSX. |
| Perforation Data: | Interval Top: | 4952 ft. | # Of Holes: | | Interval Bottom: | 4964 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 06/19/2024 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 85 |
Total Gas Produced (MCF) | 2239 |
GOR | 26341 |
GOR Determination | MCFE |
Average BOE per Day | 1.294 |
Average MCFE per Day | 7.488 |
Federal Financial Assurance | i | |
|
|