|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/15/2022 Measured TD: 7810 ft. Vertical TD: 7810 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/15/2022 | Wellbore Permit | | Permit #: | 20020895 | Expiration Date: | 6/3/2003 | Proposed Depth/Form: | 7800 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SESE | Formation And Spacing: | Code: J-2 , Formation: J-2 SAND , Order: , Unit Acreage: 40, Drill Unit: SESE |
| | |
Wellbore Completed | Completion Date: | 2/27/1982 | Spud Date: | 10/16/1981 | Spud Date Is: | ACTUAL | Measured TD: | 7810 ft. | Measured PB depth: | 7760 ft. | True Vertical TD: | 7810 ft. | True Vertical PB depth: | | Log Types: | SP-IES, FDC-GR CALIPER LOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 212 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7799 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6760 ft., Bottom: 7799 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 1142 ft. | | | | SUSSEX | 4471 ft. | | | | SHANNON | 5286 ft. | | | | NIOBRARA | 6860 ft. | | | | FORT HAYS | 7214 ft. | | | | CODELL | 7256 ft. | | | | BENTONITE | 7538 ft. | | | | D SAND | 7636 ft. | | | | J SAND | 7700 ft. | | | |
Formation DSND Formation Classification: GW Status: AB - 3/15/2022 Interval Top: 7637 ft. Interval Bottom: 7646 ft. Completed Information for Formation D SAND | 1st Production Date: | 12/19/1981 | Choke Size: | 1.000 in. | Formation Name: | D SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/27/1982 | Treatment Summary: | SEE SCANNED DOCUMENT #00319188 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7647 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/27/1982 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 13 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 13 | CALC_GOR | 15384 | CALC_MCF_GAS | 200 | GRAVITY_OIL | 41 | MCF_GAS | 200 |
| Perforation Data: | Interval Top: | 7637 ft. | # Of Holes: | 36 | Interval Bottom: | 7646 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 03/15/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|