Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-06471
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:HOUGH #1-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:IMPETRO RESOURCES LLC - 10690
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:201068LocationID:319713
County:ADAMS #001Location:NENW 12 1S57W 6
Field:WOODROW WEST - #95000Elevation:4569 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  2150 FWLLat/Long: 39.985874 / -103.716655Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.986070 / -103.716740Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 5553 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore Permit
Permit #:19720182 Expiration Date:3/20/1973
Proposed Depth/Form:5500 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 80, Drill Unit: N2NW

Wellbore Completed
Completion Date:3/27/1972
Spud Date:3/19/1972Spud Date Is:ACTUAL
Measured TD:5553 ft.Measured PB depth:5480 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:SCHLUMBERGER IES & FDC
Casing:String Type: SURF, Hole Size: 7.875 in., Size: 8.625 in., Top: 0 ft., Depth: 145 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 145 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5480 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 4475 ft., Bottom: 5480 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA4471 ft.
FORT HAYS4890 ft.
GREENHORN5177 ft.
BENTONITE5242 ft.
D SAND5331 ft.
J SAND5396 ft.

Formation DSND                     Formation Classification:  OW                     Status:  PR - 4/1/2025                  Interval Top: 5346 ft.    Interval Bottom: 5352 ft.

 Completed Information for Formation D SAND
1st Production Date:4/12/1972Choke Size:2.000 in.
Formation Name:D SANDCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:3/27/1972
Treatment Summary:25 GALS HYFLO, 40 BBLS LEASE CRUDE
Tubing Size:2.875 in.Tubing Setting Depth:5437 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/1972Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 99
CALC_BBLS_H2O 4
CALC_BBLS_OIL 99
CALC_GOR 200
CALC_MCF_GAS 20
CASING_PRESS 50
GRAVITY_OIL 36
MCF_GAS 20
TUBING_PRESS 30
Perforation Data:
Interval Top:5346 ft.# Of Holes:25
Interval Bottom:5352 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2032
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day5.541
Average MCFE per Day32.141

 Federal Financial Assurance  i 

 Tribal Well  i No