|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/14/2020 Measured TD: 8325 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/14/2020 | | Wellbore Permit | | | Permit #: | 19710076 | Expiration Date: | 1/8/1998 | | Proposed Depth/Form: | 8370 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: J-CDL , Formation: J-CODELL , Order: 0 , Unit Acreage: 160, Drill Unit: NE/4 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 2/5/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8325 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | IES, GR DIFFERENTIAL X ABSOLUTE TEMP | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 202 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 202 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8325 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7212 ft., Bottom: 8325 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7700 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 7212 ft., Bottom: 7700 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4820 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 4680 ft., Bottom: 4820 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: 1004 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 450 ft., Bottom: 1004 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 4680 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 4250 ft., Bottom: 4680 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 7200 ft., Depth: 7590 ft., Bottom: 7560 ft., Sacks: 240, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4680 ft., Depth: 4780 ft., Bottom: 4820 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4240 ft., Depth: 4678 ft., Bottom: 4680 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 200 ft., Depth: 1004 ft., Bottom: 1006 ft., Sacks: 200, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 990 ft. | | | | | SUSSEX | 4800 ft. | | | | | SHANNON | 4910 ft. | | | | | NIOBRARA | 7250 ft. | | | | | CODELL | 7690 ft. | | | | | GREENHORN | 7770 ft. | | | | | D SAND | 8055 ft. | | | | | J SAND | 8120 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/14/2020 Interval Top: 8186 ft. Interval Bottom: 8210 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/23/1971 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/11/2018 | Treatment End Date: | N/A | | Treatment Summary: | 8186-8191, 8200-8210 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/9/2018 | Treatment End Date: | N/A | | Treatment Summary: | 8186-8191, 8200-8210 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 3/16/1971 | | Treatment Summary: | SEE DOCUMENT # 327172 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 1450 | | CASING_PRESS | 450 | | MCF_GAS | 1450 | | TUBING_PRESS | 125 |
| | Perforation Data: | | Interval Top: | 8186 ft. | # Of Holes: | 30 | | Interval Bottom: | 8210 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 9/14/2020 Interval Top: 7734 ft. Interval Bottom: 7749 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/5/1997 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 35 | | MCF_GAS | 2 |
| | Perforation Data: | | Interval Top: | 7734 ft. | # Of Holes: | 30 | | Interval Bottom: | 7749 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/6/1999 Interval Top: 7734 ft. Interval Bottom: 8210 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 9/5/1998 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | PLUNGER 500 | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/16/1971 | | Treatment Summary: | REMOVED BRIDGE PLUG AND COMMINGLE J SAND-CODELL FORMATIONS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8187 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/16/1998 | Test Method: | PLUNGER 500 | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 10800 | | CALC_MCF_GAS | 54 | | CASING_PRESS | 590 | | GRAVITY_OIL | 60 | | MCF_GAS | 54 | | TUBING_PRESS | 450 |
| | Perforation Data: | | Interval Top: | 7734 ft. | # Of Holes: | | | Interval Bottom: | 8210 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/14/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|