|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/21/1972 Measured TD: 8124 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/21/1972 | | Wellbore Permit | | | Permit #: | 19700654 | Expiration Date: | 3/23/1971 | | Proposed Depth/Form: | 8050 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MDDYJ , Formation: MUDDY J , Order: , Unit Acreage: 320, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/2/1971 | | Spud Date: | 11/29/1970 | Spud Date Is: | ACTUAL | | Measured TD: | 8124 ft. | Measured PB depth: | 8052 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES, FDC, GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 234 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 234 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8120 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7045 ft., Bottom: 8120 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1275 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 395 ft., Bottom: 1275 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MUDDY D | 7912 ft. | | Y | | | MUDDY J | 7958 ft. | | Y | |
Formation JSND Formation Classification: OW Status: AB - 3/21/1972 Interval Top: 7972 ft. Interval Bottom: 8028 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/2/1971 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/2/1971 | | Treatment Summary: | 250 GAL 15% MA; 9,000# 20/40 SAND; 9,000# 10/20 SAND; 2,500# 8/12 BEADS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7891 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/2/1971 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 10 | | CALC_GOR | 900 | | MCF_GAS | 9 |
| | Perforation Data: | | Interval Top: | 7972 ft. | # Of Holes: | | | Interval Bottom: | 8028 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/21/1972 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|