| On 9/16/2025 UPRC 13-8F flowline confirmation sampling activities were completed. During the completion of the activities, no potential presence of impacted material(s) was observed/smelled. Consistent with Rule 912, samples were collected and analyzed to determine whether any constituents are present at levels in excess of Table 915-1 standards. Final laboratory analytical results received on 9/30/2025, indicate the soil sample, FLR01, discovered at the flowline riser exceeded ECMC Table 915 standards for 1,3,5-trimethylbenzene at 0.012 mg/kg. Groundwater was not encountered during confirmation sampling activities. A supplemental Form 27 has been submitted for remediation project number 38991 detailing the remedial site plan, document number: 404372908. |