| On 7/15/2025, Willow Bend LD 18-37HN flowline decommissioning activities were completed. During the completion of the activities, no potential presence of impacted material(s) was observed/smelled. Consistent with Rule 912, samples were collected and analyzed to determine whether any constituents are present at levels in excess of Table 915-1 standards. Final laboratory analytical results received on 7/29/2025, indicate that soil sample, FL04R-W discovered at the wellhead flowline riser, exceeded ECMC Table 915 standards for TPH at 782 mg/kg. Groundwater was not encountered during decommissioning activities. This location is within the municipality of Thornton.
|