| Between August 8, 2024, and October 9, 2024, three sampling events were conducted to characterize the BJU M23A 496 pad surface area previously used for cuttings storage. Based on the analytical results of the collected samples, a total of 76 cubic yards of surface soil has been removed and properly disposed of at Greenleaf Environmental Services (Greenleaf) in De Beque, Colorado of which part was deemed compliant. Additional delineation is required and estimated impacted soil volume is greater than 10 yards. |