| Facility ID: | 488356 | Facility Name/No: | HPR Flowline System/ | | Facility Status: | AC | Status Date: | 3/9/2026 | | Operator Name: | HIGHPOINT OPERATING CORPORATION | Operator Number: | 10071 | | County: | WELD - #123 | Location: | SESW 23 5N62W | | | | Lat/Long: | 40.379622 / -104.293973 Source: ACTUAL based On LatLong | | Comment: | | | | | Jurisdiction: | COGCC | Planned Construct Date: | 10/20/2004 | | In-Service Date: | 6/1/2023 | Type of Fluid Trans: | Multiphase | | Max Anticipated Operating Pressure: | 1000 | Pipe Material: | Carbon Steel | | Testing Pressure: | 1100 | Max Outer Diameter: | 4.000 | | Test Date | 5/24/2023 | Coating: | False | | |
|