Kiwi - #483467 Information | Status: AC - 10/1/2023 |
|
Location ID: | 483467 | Location Name/No: | Kiwi/2920 | Facility Status: | AC | Facility Status Date: | 10/1/2023 | Operator Name: | VERDAD RESOURCES LLC | Operator Number: | 10651 | County: | WELD - #123 | Location: | SWNE 32 2N64W | Facility Type: | LOCATION | Lat/Long: | 40.096932 / -104.574728 | Form 2A Document #: | 402966313 | Form 2A Expiration: | 11/15/2025 | OGDP #: | 482695 |
|
Location Inventory | Wells: 9 | Oil Tanks: 2 | Condensate Tanks: 0 | Water Tanks: 8 | Buried Produced Water Vaults: 0 | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 1 | Pump Jacks: 0 | Separators: 4 | Injection Pumps: 0 | Heat-Treaters: 2 | Cavity Pumps: 0 | Gas Compressors: 2 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 0 | Fuel Tanks: 0 | LACT Unit: 3 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 0 | Flare: 0 | Enclosed Combustion Devices: 1 | Meter/Sales Building: 1 | Pigging Station: 0 | Other: The majority of flowlines will be Schedule 80 FBE welded steel including: (1) 4” Bulk Line
(2) 3” Test Line
(1) 2” Bypass Line
(1) 4” Gas Lift Trunk Line
(1) 4” Gas Sales Line
(2) 4” dump line bulk to tanks
(2) 3” dump lines test to tanks
(2) 4” dump lines bulk to HT
(2) 3” dump lines test to HT
(2) 4” dump HT to surge
(2) 4” dump HT to tanks
(1) 4” Surge to LACT
(4) 2” Air lines to wellheads, separator bank, VRUs and heater treaters
Cureton will be the Gas gatherer for the proposed pad and Verdad will work with the appropriate parties to ensure a timely gas gathering connections.
|
|
|
Related Tank Facilities | Sorry, no associated tank facilities could be found. |
|
Related Pits | Sorry, no associated pits could be found. |
|
|
Off-Location Flowlines | Sorry, no off-location flowlines could be found. |
|
Domestic Taps | Sorry, no domestic taps could be found. |
|