Off-Location Flowlines |
Facility ID: 483430 | Operator Name: KP KAUFFMAN COMPANY INC | Status: AC |
Operator Flowline ID: Stonebraker 42-12 | Start Location ID: 328493 | Location: SWNE 121N 68W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 10/8/1992 |
| |
Facility ID: 483431 | Operator Name: KP KAUFFMAN COMPANY INC | Status: AC |
Operator Flowline ID: Foreman Unit 3 | Start Location ID: 323262 | Location: SWNE 121N 68W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 4/20/1986 |
| |
Facility ID: 483432 | Operator Name: KP KAUFFMAN COMPANY INC | Status: AC |
Operator Flowline ID: Graham 1 | Start Location ID: 317997 | Location: SWNE 121N 68W |
Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 6/26/1975 |
| |