|
| Rush North - #481748 Information | Status: CL - 4/22/2022 |
|
| Spill Type: | Spill | Facility Name/No.: | Rush North / | | Facility Type: | SPILL OR RELEASE | Facility Status: | CL | | Date of Discovery: | 3/10/2022 | Date Closed: | 4/22/2022 | | Operator: | CRESTONE PEAK RESOURCES OPERATING LLC | Operator Number: | 10633 | | Municipality/County: | AURORA / ARAPAHOE - #005 | Location: | SWNW 28 4S65W | | Doc Number: | 402981262 | Lat/Long: | 39.675059 / -104.675768 Source: ACTUAL based On LatLong | Municipality (if within municipal boundaries): | Aurora | | Waters of the State: | | Impacted Media: | | Related Remediation Project Number if work proceeding under an approved Form 27: | N/A | | | | Spill Description: | | During lease operator rounds, a hammer union on a facility separator related to the Cottonwood Creek # 4-65 28-27 3AH wellhead (05-005-07464) was found leaking. The spill was estimated to be 1 BBL of production fluids and was contained to the pad surface and has been controlled. The impacted soil will be removed and hauled to a COGCC approved disposal facility. Confirmation soil samples will be collected and submitted for laboratory analysis of Table 915-1 constituents. Additionally, a waste characterization sample from the source area will be collected and submitted for analysis of COGCC Table 915-1 constituents to determine constituents of concern in the release. Background samples for inorganics and metals will be collected and submitted for laboratory analysis as needed. | | |
|
| Resolution: | | Resolving Document: 403024623 | Closure Requested: 04/22/2022 | | Resolution: -- |
|
| |
| Operator Information: | | Operator: | CRESTONE PEAK RESOURCES OPERATING LLC | | Oper. No. | 10633 | | Address: | 1801 CALIFORNIA STREET #2500 DENVER CO 80202 | | Type of Facility: | SPILL OR RELEASE | | Fac. Name: | Rush North - | | County Name: | ARAPAHOE | | qtrqtr: SWNW | section: 28 | township: 4S | range: 65W | meridian: 6 |
| | |
|