During operations, a dumpline became plugged with paraffin and began to transfer all fluids to the pit. Automation on the produced water vessel failed and caused an overflow of the vessel. The site has been shut-in until repairs and cleanup can occur. The release was contained to the pad surface. The impacted soil will be removed and hauled to a COGCC approved disposal facility. Confirmation soil samples will be collected and submitted for laboratory analysis of BTEX, 1,2,4 and 1,3,5 Trimethylbenzene, naphthalene, TPH (C6-C36), pH, EC, SAR, and boron. Additionally, a waste characterization sample from the source area will be collected and submitted for analysis of COGCC Table 915-1 constituents. Background samples for inorganics and metals will be collected and submitted for laboratory analysis as needed. |