A leak from the fire tube gasket associated with a bulk treater, resulted in the release of approximately 2 bbls of oil and 2 bbls of water all within unlined secondary containment. The release occurred at approximately 8:40 am on Tuesday, September 8, 2020 and was completely contained on-site. Surface water was not impacted, no injuries occurred as a result of the release, and cleanup is ongoing. |