| Off-Location Flowlines |
| Facility ID: 477223 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 4 | Start Location ID: 307189 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 3/16/1988 |
| |
| Facility ID: 477224 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 2 | Start Location ID: 307175 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 5/2/1985 |
| |
| Facility ID: 477225 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 7 | Start Location ID: 307178 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 10/3/1985 |
| |
| Facility ID: 477226 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 10 | Start Location ID: 307174 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 3/26/1985 |
| |
| Facility ID: 477227 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 8 | Start Location ID: 307167 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 1/26/1985 |
| |
| Facility ID: 477228 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 9 | Start Location ID: 307166 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 8/16/1984 |
| |
| Facility ID: 477229 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 5 | Start Location ID: 307163 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 5/21/1984 |
| |
| Facility ID: 477230 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 1 | Start Location ID: 307170 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 12/3/1984 |
| |
| Facility ID: 477231 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 6 | Start Location ID: 307168 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 8/16/1984 |
| |
| Facility ID: 477232 | Operator Name: BLACKROCK ENERGY CORP | Status: AC |
| Operator Flowline ID: 3 | Start Location ID: 307172 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 12/26/1984 |
| |
| Facility ID: 477232 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 3 | Start Location ID: 307172 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 12/26/1984 |
| |
| Facility ID: 477231 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 6 | Start Location ID: 307168 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 8/16/1984 |
| |
| Facility ID: 477230 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 1 | Start Location ID: 307170 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 12/3/1984 |
| |
| Facility ID: 477229 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 5 | Start Location ID: 307163 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 5/21/1984 |
| |
| Facility ID: 477228 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 9 | Start Location ID: 307166 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 8/16/1984 |
| |
| Facility ID: 477227 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 8 | Start Location ID: 307167 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 1/26/1985 |
| |
| Facility ID: 477226 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 10 | Start Location ID: 307174 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 3/26/1985 |
| |
| Facility ID: 477225 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 7 | Start Location ID: 307178 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 10/3/1985 |
| |
| Facility ID: 477224 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 2 | Start Location ID: 307175 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 5/2/1985 |
| |
| Facility ID: 477223 | Operator Name: TOM FENNO PRODUCTION LLC | Status: AC |
| Operator Flowline ID: 4 | Start Location ID: 307189 | Location: SENE 229N 68W |
| Flowline Type: Wellhead Line | Fluid Type: | Pipe Material: | Construction Date: 3/16/1988 |
| |