| Grizzly Operating was performing annual flowline pressure tests on June 9th, 2020 at our Stranahan-66S92W location and determined that the dump lines were losing pressure during the tests. On June 10th, 2020, we began excavating the lines to determine the cause of the pressure loss and encountered impacted soils. Excavation and assessment activities are ongoing, but the released volume is currently being estimated at approximately 1-5 barrels of produced water. A third-party environmental consultant is on the location today and is field screening the soils and collecting confirmation samples, as necessary. |