|
| PAPA JO AND YELLOWHAMMER FACILITY - #472048 Information | Status: AC - 7/14/2022 |
|
|
| Location Inventory | | Wells: 0 | Oil Tanks: 0 | Condensate Tanks: 1 | Water Tanks: 3 | Buried Produced Water Vaults: 0 | | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 0 | | Pump Jacks: 0 | Separators: 11 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 0 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 0 | Fuel Tanks: 0 | | LACT Unit: 2 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 1 | Flare: 0 | | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | | Other: Please see comment section for pipeline description.
Up to 16 temporary 500 barrel tanks and 2 temporary ECDs will be utilized during flowback and initially for produced water. It is estimated the temporary tanks and 2 ECDs will be on location for 9 - 12 months, and will be removed incrementally as water production declines. A temporary generator may be placed on location if needed, and would be in place until electric power is available. A temporary purge flare may be placed on location for up to 60 days. |
|
| |
|
| Related Pits | | Sorry, no associated pits could be found. |
|
| Wells | | Sorry, no associated wells could be found. |
|
| Off-Location Flowlines | | Sorry, no off-location flowlines could be found. |
|
| Domestic Taps | | Sorry, no domestic taps could be found. |
|