| Comments: The F09 CDP (Central Delivery Point) is located in the SENW, Sec 9, T5S, R96W. It was built in 2007-08 when Conoco was up there drilling. The current F09 CDP gathers gas and fluids from 12 pads but is too small to handle the new production. As a result, Caerus will need to go in and build a bigger CDP that will handle the Upper West Fork Development, K08, G09 and the 16 pads proposed to be drilled. The CDP will consist of 2 to 3 generators, 2 to 3 horizontal multi stage pumps, slug catchers and several 300 or 400 bbl tanks for oil production. Caerus is in the process of designing this CDP. |