| A release occurred at the Gee 15C-25HZ well head during workover operations. Oil, condensate, and produced water released from the well head and misted onto the ground surface, two isolated gravel quarry ponds, and a wetland fringe area along a dry drainage. The volume of the release is still being investigated. Excavation and cleanup activities are ongoing at the site. Confirmation soil samples will be collected from the excavation and will be submitted for laboratory analysis of TPH, BTEX, pH, EC, and SAR (if applicable). Surface water samples will be collected from the two ponds for laboratory analysis of BTEX. The analytical results and excavation details will be provided in a supplemental report. A topographic Site Location Map of the general release area is provided as Figure 1. |