Skip to Main Content

COGIS

Facility Detail

COGIS - LOCATION INFORMATION

Click image to view related facilities. RelatedClick image to view inspection information. InspView GIS GISClick image to view imaged documents for this well/facility. DocClick image to view facility COAs and BMPs. COAClick image to search for orders within this facility's section. Orders
B&D Land 4-64 4 - #442643 InformationStatus: AC - 3/1/2022
Location ID:442643Location Name/No:B&D Land 4-64 4/1H
Facility Status:ACFacility Status Date:3/1/2022
Operator Name:BURLINGTON RESOURCES OIL & GAS LPOperator Number:26580
County:ARAPAHOE  - #005Location:SESE 4 4S64W
Facility Type:LOCATIONLat/Long:39.726694 / -104.547081
Form 2A Document #:402289737Form 2A Expiration:1/12/2024
Location Inventory
Wells:  1Oil Tanks:  3Condensate Tanks:  0Water Tanks:  1Buried Produced Water Vaults:  0
Drilling Pits:  0Production Pits:  0Special Purpose Pits:  0Multi-Well Pits:  0Modular Large Volume Tanks:  0
Pump Jacks:  1Separators:  2Injection Pumps:  0Heat-Treaters:  0Cavity Pumps:  0
Gas Compressors:  1Gas or Diesel Motors:  0Electric Motors:  4Electric Generators:  0Fuel Tanks:  0
LACT Unit:  2Dehydrator Units:  2Vapor Recovery Unit:  0VOC Combustor:  1Flare:  1
Enclosed Combustion Devices:  0Meter/Sales Building:  0Pigging Station:  0
Other:  From the wellhead(s), 3” carbon steel flowline(s) run to an inlet manifold which routes flow to 2 phase separation. High pressure gas from the 2 phase separator(s) is sent down the sales gas line to a third party. The liquid from the 2 phase separator(s) is carried to 3 phase separation for further processing. Low pressure gas off the 3 phase separator(s) and VRT is sent to a vapor recovery unit to compress the low pressure gas so it can be sent down the high pressure sales line to a third party. If a VRU is not present the low pressure gas is routed to enclosed combustion devices for destruction. Oil from 3 phase separation is transferred to a vapor recovery tower then to tankage for storage and eventual sales. Water from 3 phase separation is transferred to the water tanks for storage and eventual disposal.
 
Related Tank Facilities
Sorry, no associated tank facilities could be found.
Related Pits
Sorry, no associated pits could be found.
Wells
API Number:05-005-07245Operator Name:CRESTONE PEAK RESOURCES OPERATING LLC #10633Well Name:  B&D LAND 4-64 4-5 #4BH
Well Status:PRLocation:  SESE 4 4S 64W

API Number:05-005-07246Operator Name:BURLINGTON RESOURCES OIL & GAS LP #26580Well Name:  B & D Land 4-64 3 #1H
Well Status:ALLocation:  SESE 4 4S 64W

Off-Location Flowlines
Sorry, no off-location flowlines could be found.
Domestic Taps
Sorry, no domestic taps could be found.