| Facility ID: | 439357 | Facility Name/No: | XTO ENERGY / PIT |
| Operator Name/No: | QB ENERGY OPERATING LLC/10844 | Facility Status/Date: | CL / (10/17/2014) |
| County Name/No: | RIO BLANCO / 103 | Location: | SWSE 13 2S97W |
| Field Name/No: | PICEANCE CREEK / 68800 | Lat/Long: | |
| Pit Use: | | Offsite Disposal: | N/A |
| Existing Site Conditions |
| Sensitive Area: | | Land Use: | |
| Dist. to Surface Water: | | Depth to Ground Water: | |
| Dist. to Water Wells: | |
| Pit Design and Construction Data |
| Size of Pit (feet): | Depth: | ft. |
| Length: | ft. | Width: | ft. |
| Calc. PIT Capacity (bbls/day): |
| Daily Disposal Rates (bbls/day) |
| Evap: | | Perc: | |
| Pit Type: | UnLined | Liner Material: | |
| Thickness: | | Treatment Method: | |
| Pit Covering Fence: | | Net: | |
| Comment: | The unpermitted NW Cuttings Pit was discovered and remediated under Form 27/27a REM 5077. The sampling and analysis of the pit bottom and sidewalls post-excavation met all requirements under Table 910-1. The remediation is considered complete with no further action required. The pit is approved for backfilling under all applicable COGCC rules and Conditions of Approval. |
| Rule 909.j Inspection Information |
| There Is no Rule 909.j inspection information to display. |
| |
| Rule 909.j Sample Data |