|
| AGGREGATE STATE - #434766 Information | Status: AC - 6/1/2023 |
|
| Location ID: | 434766 | Location Name/No: | AGGREGATE STATE/37C-16HZ (Click Location Name for Water Production Data) | | Facility Status: | AC | Facility Status Date: | 6/1/2023 | | Operator Name: | KERR MCGEE OIL & GAS ONSHORE LP | Operator Number: | 47120 | | County: | WELD - #123 | Location: | NESE 9 2N66W | | Facility Type: | LOCATION | Lat/Long: | 40.151930 / -104.776135 | | Basin: | DENVER (DJ) BASIN | | | | Form 2A Document #: | 400474181 | Form 2A Expiration: | 10/17/2016 |
|
| Location Inventory | | Wells: 3 | Oil Tanks: 0 | Condensate Tanks: 0 | Water Tanks: 0 | Buried Produced Water Vaults: 0 | | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 2 | | Pump Jacks: 3 | Separators: 0 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 0 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 0 | Fuel Tanks: 0 | | LACT Unit: 0 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 0 | Flare: 0 | | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | | Other: Three flow lines will be utilized during production and will flow southwest to the production facility. Flow lines are typically 2”. Flow lines are constructed from steel, buried, and vary in length generally equaling the distance between the well heads and the tank battery (typically ranging from 75’ to 3500” feet). Three fuel gas supply lines will also be installed from the well head to the production facility. The supply lines will flow northeast from the production facility to the well head. Supply lines are typically 1”. Supply lines are constructed from poly or steel, buried, and vary in length generally equaling the distance between the well heads and the tank battery. Gas lift lines are occasionally installed (one per well) from the well head to the production facility. During operation flow direction in the gas lift lines will be from the production facility to the wellhead. Gas lift lines are typically 2”. Gas lift lines are constructed from steel, buried, and vary in lengt |
|
| |
| Related Tank Facilities | | Sorry, no associated tank facilities could be found. |
|
| Related Pits | | Sorry, no associated pits could be found. |
|
|
| Off-Location Flowlines | | Sorry, no off-location flowlines could be found. |
|
| Domestic Taps | | Sorry, no domestic taps could be found. |
|