| Comment: | FORM 28 REVIEW IN PROCESS AND HAS NOT BEEN APPROVED. SESW Sec 32, T5S, R96W, 6th PM AJFischer 7/26/13
FORM 28 HAS BEEN APPROVED 7/25/14 SEE COAS
FINANCIAL ASSURANCE COAs:
Financial assurance, based on re-evaluated cost of reclamation, closure and abandonment estimate, will be reviewed at five (5) year intervals over the life of the Facility; however, the COGCC reserves the right to review the financial assurance for adequacy on a more frequent basis.
WATER RESOURCES (SURFACE WATER AND GROUNDWATER) PROTECTION COAs:
GENERAL SITE COAs:
Surface water sampling event(s) shall be targeted for the spring 2014 runoff period. Surface water samples shall be collected upstream of 32C, downstream of 32C, and from the spring located approximately 4,000 feet north from the 32C pond. Water quality analysis shall include BTEX, TPH-DRO, TPH-GRO, TDS, chloride, sulfate, total suspended solids, and pH.
Provide results of pit liner integrity on an annual basis as part of the annual report.
See Remediation Project #15403, F27 doc #402445404, and NFA report doc #402447265 for pit closure documentation. S. Arauza 7/27/2020. |