Off-Location Flowlines |
Facility ID: 473387 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336089_IA | Start Location ID: 407093 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |
Facility ID: 473388 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336094_IA | Start Location ID: 416456 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |
Facility ID: 473389 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336090_IA | Start Location ID: 407093 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |
Facility ID: 473390 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336093_IA | Start Location ID: 416456 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |
Facility ID: 473391 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336092_IA | Start Location ID: 416456 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |
Facility ID: 473392 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336251_IA | Start Location ID: 407093 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |
Facility ID: 473393 | Operator Name: CRESTONE PEAK RESOURCES OPERATING LLC | Status: AC |
Operator Flowline ID: 12336091_IA | Start Location ID: 416456 | Location: NENW 2 2N 66W |
Flowline Type: Process Piping | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 7/11/2013 |
| |