Skip to Main Content

COGIS

Facility Detail

COGIS - PIT INFORMATION

Click image to view related facilities. RelatedClick image to view inspection information. InspView GIS GISView Old GIS Old GISClick image to view imaged documents for this well/facility. DocClick image tofacility COAs And BMPs. COAClick image to search for orders within this facility's section. Orders
A28 - #425547 InformationStatus: AC - 9/19/2011
Facility ID:425547Facility Name/No:A28 / 595
Operator Name/No:QB ENERGY OPERATING LLC/10844Facility Status/Date:AC / (9/19/2011)
County Name/No:GARFIELD / 045Location:NENE 28 5S95W
Field Name/No:GRAND VALLEY / 31290Lat/Long:39.590860 / -108.053800
Pit Use:Offsite Disposal:N/A
Existing Site Conditions
Sensitive Area:YLand Use:NON CROP LAND
Dist. to Surface Water:100 ft.Depth to Ground Water:40 ft.
Dist. to Water Wells:2750 ft.
Pit Design and Construction Data
Size of Pit (feet):Depth:14 ft. ft.
Length:163 ft.Width:76 ft.
Calc. PIT Capacity (bbls/day):  30871
Daily Disposal Rates (bbls/day)
Evap:Perc:
Pit Type:LinedLiner Material:HDPE
Thickness:30Treatment Method:MECHANICAL SETTLING/SEPARATING
Pit Covering Fence:FENCEDNet:NETTED
Comment:Previous Pit status was undefined. The pit was backfilled in 2009 with impacted soil to a depth of more than 20 feet. Encana installed SVE wells. Additional SVE wells were installed in 2017. Caerus intends to continue to utilize the bio-vent wells for passive venting with quarterly enhanced powered SVE events using Caerus’ SVE trailer to supplement air flow and enhance on-going remediation. The pit will remain ACTIVE until remediation is completed. Note: REM #7742 is a general Form 27 submitted to close a group of pits. C Lujan, 02/15/2018
Rule 909.j Inspection Information
There Is no Rule 909.j inspection information to display.
 
Rule 909.j Sample Data
No associated samples could be found.