| Facility ID: | 425547 | Facility Name/No: | A28 / 595 |
| Operator Name/No: | QB ENERGY OPERATING LLC/10844 | Facility Status/Date: | AC / (9/19/2011) |
| County Name/No: | GARFIELD / 045 | Location: | NENE 28 5S95W |
| Field Name/No: | GRAND VALLEY / 31290 | Lat/Long: | 39.590860 / -108.053800 |
| Pit Use: | | Offsite Disposal: | N/A |
| Existing Site Conditions |
| Sensitive Area: | Y | Land Use: | NON CROP LAND |
| Dist. to Surface Water: | 100 ft. | Depth to Ground Water: | 40 ft. |
| Dist. to Water Wells: | 2750 ft. |
| Pit Design and Construction Data |
| Size of Pit (feet): | Depth: | 14 ft. ft. |
| Length: | 163 ft. | Width: | 76 ft. |
| Calc. PIT Capacity (bbls/day): 30871 |
| Daily Disposal Rates (bbls/day) |
| Evap: | | Perc: | |
| Pit Type: | Lined | Liner Material: | HDPE |
| Thickness: | 30 | Treatment Method: | MECHANICAL SETTLING/SEPARATING |
| Pit Covering Fence: | FENCED | Net: | NETTED |
| Comment: | Previous Pit status was undefined. The pit was backfilled in 2009 with impacted soil to a depth of more than 20 feet. Encana installed SVE wells. Additional SVE wells were installed in 2017. Caerus intends to continue to utilize the bio-vent wells for passive venting with quarterly enhanced powered SVE events using Caerus’ SVE trailer to supplement air flow and enhance on-going remediation. The pit will remain ACTIVE until remediation is completed. Note: REM #7742 is a general Form 27 submitted to close a group of pits. C Lujan, 02/15/2018 |
| Rule 909.j Inspection Information |
| There Is no Rule 909.j inspection information to display. |
| |
| Rule 909.j Sample Data |