| Location Inventory | | Wells: 9 | Oil Tanks: 0 | Condensate Tanks: 2 | Water Tanks: 6 | Buried Produced Water Vaults: 0 | | Drilling Pits: 2 | Production Pits: 0 | Special Purpose Pits: 2 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 0 | | Pump Jacks: 0 | Separators: 2 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 0 | Gas or Diesel Motors: 1 | Electric Motors: 0 | Electric Generators: 1 | Fuel Tanks: 0 | | LACT Unit: 1 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 0 | Flare: 0 | | Enclosed Combustion Devices: 2 | Meter/Sales Building: 1 | Pigging Station: 0 | | Other: See Construction Layout, Preliminary Drill Rig Layout, Well Completions & Stimulation Layout, Flowback Equipment Layout, Interim Reclamation Production Schematic, and Related Location Flowline Map & Table. For off-location flowlines, Caerus will utilize an EXISTING, buried, 6" natural gas gathering pipeline and an EXISTING, buried, 6" produced water gathering line. Caerus is permitting the use of an additional, temporary, surface, up-to-12" water transfer line, which will be laid over the existing pipeline disturbance right-of-way for approximately 3,636 feet in length, extending from the southeast edge of the Well Pad down the ridge generally northeasterly to the tie-in can for existing, operated infrastructure. This temporary surface line will deliver recycled water for completion operations and gather flowback water for recycling. Once all the wells on the Well Pad have been converted to permanent production, this surface pipeline will be removed. |
|