On January 1, 2015, due to freezing temperatures, approximately 15-20 bbls of produced water were released from a water truck at the facility. The release occurred outside of secondary containment. Another water truck at the location vacuumed up as much of the released water as possible. Soil excavation based on visual and olfactory evidence is currently underway, and soil samples will be collected and analyzed to confirm adequate removal of all impacted soils. A spill report will be submitted within 72 hours of the event. The site is located in Weld County, in the NENE Section 36, Township 6N, Range 66W, 6th p.m. Additional information regarding the soil excavation and soil sample analytical results will be submitted on a Supplemental Form 19 within 10 calendar days of the event. |