|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/3/1991 Measured TD: 1825 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/3/1991 | | Wellbore Permit | | | Permit #: | 19900993 | Expiration Date: | 1/3/1991 | | Proposed Depth/Form: | 1825 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: NE4 |
| | |
| Wellbore Completed | | Completion Date: | 11/16/1990 | | Spud Date: | 10/12/1990 | Spud Date Is: | ACTUAL | | Measured TD: | 1825 ft. | Measured PB depth: | 1770 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-SFL-GR, FDC-CNL, SONIC-CBL | | Casing: | String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 208 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 1819 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 1638 ft. | | N | N |
Formation NBRR Formation Classification: GW Status: PR - 1/3/1991 Interval Top: 1638 ft. Interval Bottom: 1660 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/4/1990 | Choke Size: | 0.406 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/16/1990 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00310402 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/5/1990 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| CASING_PRESS | 146 | | MCF_GAS | 725 |
| | Perforation Data: | | Interval Top: | 1638 ft. | # Of Holes: | 88 | | Interval Bottom: | 1660 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2720 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.281 |
| Average MCFE per Day | 7.442 |
| Federal Financial Assurance | i | |
|
|