|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2015 Measured TD: 1647 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2015 | | Wellbore Permit | | | Permit #: | 19821984 | Expiration Date: | 4/2/1983 | | Proposed Depth/Form: | 1675 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: SE4 |
| | |
| Wellbore Completed | | Completion Date: | 3/8/1983 | | Spud Date: | 12/4/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 1647 ft. | Measured PB depth: | 1599 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | WELEX DUAL INDUCTION W/GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 9.875 in., Size: 7 in., Top: , Depth: 87 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 35, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.25 in., Top: , Depth: 1639 ft., Weight: 9.5 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 1467 ft. | | N | N |
Formation NBRR Formation Classification: GW Status: PR - 6/1/2015 Interval Top: 1481 ft. Interval Bottom: 1496 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/13/1983 | Choke Size: | 1.000 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/8/1983 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00335101 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/7/1983 | Test Method: | FLOWING | | Hours Tested: | 71 | Gas Type: | SHALE | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 994 | | MCF_GAS | 994 |
| | Perforation Data: | | Interval Top: | 1481 ft. | # Of Holes: | 30 | | Interval Bottom: | 1496 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 09/2024 - 08/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1553 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.729 |
| Average MCFE per Day | 4.257 |
| Federal Financial Assurance | i | Y |
|
|