|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/11/2024 Measured TD: 11026 ft. Vertical TD: 6352 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/11/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/16/2027 | | Proposed Top PZ Location: | Sec:25 Twp: 5N 63W | Footage: 470 FSL 1047 FWL | | Bottom Hole Location: | Sec:25 Twp: 5N 63W | Footage: 300 FNL 1080 FWL | | Proposed Depth/Form: | 11000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-3566 , Unit Acreage: 960, Drill Unit: T5N R63W SEC 24: E2, | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.95 , Citings Type: PLANNED | | Cement: | Sacks: 105, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 509, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11000 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1617, Top: , Bottom: 11000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/5/2024 | | Spud Date: | 3/28/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 11026 ft. | Measured PB depth: | 11015 ft. | | True Vertical TD: | 6352 ft. | True Vertical PB depth: | 6352 ft. | | Top PZ Location: | Sec:25 Twp: 5N 63W | Footage: 551 FSL 1095 FWL | | Bottom Hole Location: | Sec:25 Twp: 5N 63W | Footage: 301 FNL 1070 FWL | | Log Types: | CBL, MWD/LWD, (Resistivity on 123-52462). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 36.95 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1628 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 659, Top: 0 ft., Bottom: 1628 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11015 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1805, Top: 210 ft., Bottom: 11015 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3332 ft. | | N | N | | SUSSEX | 3802 ft. | | N | N | | SHANNON | 5508 ft. | | N | N | | SHARON SPRINGS | 6363 ft. | | N | N | | NIOBRARA | 6413 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 10/11/2024 Interval Top: 6694 ft. Interval Bottom: 10948 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/1/2024 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/25/2024 | Treatment End Date: | 8/1/2024 | | Treatment Summary: | Niobrara frac'd with 25 stage plug and perf:
7245682 total lbs proppant pumped: 6947392 lbs 40/70 mesh and 298290 lbs 100 mesh;
246265 total bbls fluid pumped: 240192 bbls gelled fluid; 6037 bbls fresh water and 36 bbls 15% HCl Acid. | | Total fluid used in treatment (bbls): | 246265 | Max pressure during treatment (psi): | 8668 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 25 | | Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 6037 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 7245682 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6393 ft. | | Tubing Packer Depth: | 6392 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/11/2024 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 622 | | BBLS_OIL | 360 | | BTU_GAS | 1300 | | CALC_BBLS_H2O | 622 | | CALC_BBLS_OIL | 360 | | CALC_GOR | 978 | | CALC_MCF_GAS | 352 | | CASING_PRESS | 262 | | GRAVITY_OIL | 44 | | MCF_GAS | 352 | | TUBING_PRESS | 882 |
| | Perforation Data: | | Interval Top: | 6694 ft. | # Of Holes: | 1618 | | Interval Bottom: | 10948 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 43126 |
| Total Gas Produced (MCF) | 197057 |
| GOR | 4569 |
| GOR Determination | BOE |
| Average BOE per Day | 211.747 |
| Average MCFE per Day | 1228.156 |
| Federal Financial Assurance | i | |
|
|