Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-52163
Well Classification: OW Status: PR - 3/13/2025
Well Name/No:Foose State #A17-618
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/13/2025
FacilityID:484382LocationID:483511
County:WELD #123Location:NESE 18 6N64W 6
Field:WATTENBERG - #90750Elevation:4705 ft.
Planned Location:2347FSL  687 FELLat/Long: 40.485155 / -104.586189Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/24/2024
End Date: 1/8/2025
Reported: 2/21/2025
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/13/2025             Measured TD: 17755 ft.    Vertical TD: 6844 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/13/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/24/2030
Proposed Top PZ Location:Sec:17 Twp: 6N 64W Footage: 510 FSL  200 FWL
Bottom Hole Location:Sec:16 Twp: 6N 64W Footage: 510 FSL  200 FEL
Proposed Depth/Form:17773 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3384 , Unit Acreage: 1280, Drill Unit: 6N-64W-16: ALL; 17:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 640, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17773 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2073, Top: , Bottom: 17773 ft.

Wellbore Completed
Completion Date:10/30/2023
Spud Date:10/20/2023Spud Date Is:ACTUAL
Measured TD:17755 ft.Measured PB depth:17720 ft.
True Vertical TD:6844 ft.True Vertical PB depth:6844 ft.
Top PZ Location:Sec:17 Twp: 6N 64WFootage: 506 FSL  228 FWL
Bottom Hole Location:Sec:16 Twp: 6N 64WFootage: 491 FSL  200 FEL
Log Types:CBL, MWD/LWD, NEU, RES, (2nd RES in 123-52159)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 45 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1913 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 1913 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17739 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2115, Top: 882 ft., Bottom: 17739 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3688 ft.
SUSSEX4281 ft.
SHANNON5261 ft.
TEEPEE BUTTES6244 ft.
SHARON SPRINGS6957 ft.
NIOBRARA6997 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/13/2025                 Interval Top: 7588 ft.    Interval Bottom: 17705 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/5/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/24/2024Treatment End Date:1/8/2025
Treatment Summary:Niobrara completed with 294 bbls 28% HCL, 300,608 bbls slurry, 18,197,657 lb 40/140 Sand.
Total fluid used in treatment (bbls):300902Max pressure during treatment (psi):8404
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):294Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):300608Disposition method For flowback:DISPOSAL
Total proppant used (lbs):18197657Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7402 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 428
BBLS_OIL 448
BTU_GAS 1000
CALC_BBLS_H2O 428
CALC_BBLS_OIL 448
CALC_GOR 1509
CALC_MCF_GAS 676
CASING_PRESS 2205
GRAVITY_OIL 42
MCF_GAS 676
TUBING_PRESS 1714
Perforation Data:
Interval Top:7588 ft.# Of Holes:1344
Interval Bottom:17705 ft.Hole Size:0.38 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/25/2025
Defined InactiveN 
Low ProducingYProduction Period
01/2024 - 12/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No