Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-52158
Well Classification: OW Status: PR - 3/13/2025
Well Name/No:Foose State #A17-665
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/13/2025
FacilityID:484377LocationID:483511
County:WELD #123Location:NESE 18 6N64W 6
Field:WATTENBERG - #90750Elevation:4703 ft.
Planned Location:2351FSL  874 FELLat/Long: 40.485160 / -104.586863Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/10/2025
End Date: 1/28/2025
Reported: 3/18/2025
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/13/2025             Measured TD: 17517 ft.    Vertical TD: 6791 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/13/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/24/2030
Proposed Top PZ Location:Sec:17 Twp: 6N 64W Footage: 1620 FNL  200 FWL
Bottom Hole Location:Sec:16 Twp: 6N 64W Footage: 1634 FNL  200 FEL
Proposed Depth/Form:17519 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3384 , Unit Acreage: 1280, Drill Unit: 6N-64W-16: ALL; 17:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 640, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17519 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2029, Top: , Bottom: 17519 ft.

Wellbore Completed
Completion Date:11/19/2023
Spud Date:10/23/2023Spud Date Is:ACTUAL
Measured TD:17517 ft.Measured PB depth:17487 ft.
True Vertical TD:6791 ft.True Vertical PB depth:6791 ft.
Top PZ Location:Sec:17 Twp: 6N 64WFootage: 1602 FNL  191 FWL
Bottom Hole Location:Sec:16 Twp: 6N 64WFootage: 1647 FNL  201 FEL
Log Types:CBL, MWD/LWD, (RES in 123-52159, RES in 123-52163)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 45 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1944 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 671, Top: 0 ft., Bottom: 1944 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17506 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2081, Top: 1254 ft., Bottom: 17506 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3661 ft.
SUSSEX4245 ft.
SHANNON5207 ft.
TEEPEE BUTTES6188 ft.
SHARON SPRINGS6904 ft.
NIOBRARA6943 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/13/2025                 Interval Top: 7376 ft.    Interval Bottom: 17473 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/5/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/10/2025Treatment End Date:1/28/2025
Treatment Summary:Niobrara completed with 336 bbls 28% HCL, 763,190 bbls slurry, 24,219,330 lb 40/140 Sand.
Total fluid used in treatment (bbls):763526Max pressure during treatment (psi):8216
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):336Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):763190Disposition method For flowback:DISPOSAL
Total proppant used (lbs):24219330Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7208 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 737
BBLS_OIL 208
BTU_GAS 1000
CALC_BBLS_H2O 737
CALC_BBLS_OIL 208
CALC_GOR 1447
CALC_MCF_GAS 301
CASING_PRESS 2352
GRAVITY_OIL 42
MCF_GAS 301
TUBING_PRESS 1608
Perforation Data:
Interval Top:7376 ft.# Of Holes:1332
Interval Bottom:17473 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No