Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-52115
Well Classification: OW Status: PR - 8/13/2024
Well Name/No:HETHCOCK #5-11HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/13/2024
FacilityID:484195LocationID:483362
County:WELD #123Location:SENW 5 3N65W 6
Field:WATTENBERG - #90750Elevation:4903 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1690FNL  2456 FWLLat/Long: 40.257037 / -104.687879Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.257036 / -104.687878Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/24/2024
End Date: 4/1/2024
Reported: 5/14/2024
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/13/2024             Measured TD: 20264 ft.    Vertical TD: 7294 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/13/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2025
Proposed Top PZ Location:Sec:5 Twp: 3N 65W Footage: 780 FNL  1344 FEL
Bottom Hole Location:Sec:17 Twp: 3N 65W Footage: 2421 FNL  1330 FEL
Proposed Depth/Form:20269 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3412 , Unit Acreage: 6160, Drill Unit: T3N R65W; 04: All; 0
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1725 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 1725 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20259 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2300, Top: , Bottom: 20259 ft.

Wellbore Completed
Completion Date:11/13/2023
Spud Date:7/5/2023Spud Date Is:ACTUAL
Measured TD:20264 ft.Measured PB depth:20204 ft.
True Vertical TD:7294 ft.True Vertical PB depth:7285 ft.
Top PZ Location:Sec:5 Twp: 3N 65WFootage: 809 FNL  1364 FEL
Bottom Hole Location:Sec:17 Twp: 3N 65WFootage: 2390 FSL  1309 FEL
Log Types:CBL, MWD/LWD (RES in API 123-52106 and 123-52118)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1957 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 871, Top: 0 ft., Bottom: 1957 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 20249 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2082, Top: 280 ft., Bottom: 20264 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4071 ft.
SUSSEX4522 ft.
SHARON SPRINGS7361 ft.
NIOBRARA7411 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/13/2024                 Interval Top: 8484 ft.    Interval Bottom: 20088 ft.

 Completed Information for Formation CODELL
1st Production Date:7/15/2024Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/23/2025Treatment End Date:N/A
Treatment Summary:CODELL PERFS: 8,484-12,855, 13,708-20,088
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/24/2024Treatment End Date:4/2/2024
Treatment Summary:CODELL PERFS: 8,484-12,855, 13,708-20,088
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8484 ft.# Of Holes:648
Interval Bottom:20088 ft.Hole Size:0.46 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 8/13/2024                 Interval Top: 8082 ft.    Interval Bottom: 20088 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/15/2024Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/24/2024Treatment End Date:4/2/2024
Treatment Summary:24 BBL 15% HCL ACID; 15 Y007-FB ACID; 54 BBL 7.5% HCL ACID; 11,313 BBL PUMP DOWN; 219,977 BBL SLICKWATER; 231,383 BBL TOTAL FLUID; 6,152,930 LBS 30/50 GENOA/SAND HILLS; 251,780 LBS 100 MESH GENOA/SAND HILLS; 6,404,710 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):231383Max pressure during treatment (psi):8912
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):93Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):2170Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):229120Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6404710Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7805 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/18/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 202
BBLS_OIL 213
BTU_GAS 1221
CALC_BBLS_H2O 202
CALC_BBLS_OIL 213
CALC_GOR 12314
CALC_MCF_GAS 2617
CASING_PRESS 1910
GRAVITY_OIL 71
MCF_GAS 2617
TUBING_PRESS 1528
Perforation Data:
Interval Top:8082 ft.# Of Holes:720
Interval Bottom:20088 ft.Hole Size:0.46 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/13/2024                 Interval Top: 8082 ft.    Interval Bottom: 13658 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:7/15/2024Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/23/2025Treatment End Date:N/A
Treatment Summary:ORT HAYS PERFS ARE FROM: 8082-8435, 12,904-13,658
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/24/2024Treatment End Date:4/2/2024
Treatment Summary:FORT HAYS PERFS ARE FROM: 8082-8435, 12,904-13,658
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8082 ft.# Of Holes:72
Interval Bottom:13658 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)46740
Total Gas Produced (MCF)1645311
GOR35201
GOR DeterminationMCFE
Average BOE per Day905.674
Average MCFE per Day5252.897

 Federal Financial Assurance  i 

 Tribal Well  i No