Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51953
Well Classification: OW Status: PR - 11/21/2023
Well Name/No:Cosslett East #1E-22H-H168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/21/2023
FacilityID:483581LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5183 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1715FNL  1168 FELLat/Long: 40.039231 / -104.984222Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039231 / -104.984221Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/11/2023
End Date: 8/23/2023
Reported: 9/21/2023
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/21/2023             Measured TD: 18560 ft.    Vertical TD: 7765 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/21/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2025
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 460 FNL  1740 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68W Footage: 460 FSL  1740 FWL
Proposed Depth/Form:18797 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: T1N R68W Sec. 22: E/
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 550 ft., Weight: 54.4 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2460 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 819, Top: 0 ft., Bottom: 2460 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18797 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2932, Top: , Bottom: 18797 ft.
Casing:String Type: NEW, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:4/27/2023
Spud Date:3/15/2023Spud Date Is:ACTUAL
Measured TD:18560 ft.Measured PB depth:18558 ft.
True Vertical TD:7765 ft.True Vertical PB depth:7765 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 471 FNL  1713 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68WFootage: 461 FSL  1750 FWL
Log Types:CBL, MWD/LWD, (Resistivity on 123-51944).
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 606 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 0 ft., Bottom: 606 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2544 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 0 ft., Bottom: 2544 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18558 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2950, Top: 1450 ft., Bottom: 18558 ft., Determination Method: CBL
Casing:String Type: NEW, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 145 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 145 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN5238 ft.NN
SUSSEX5912 ft.NN
SHANNON6367 ft.NN
SHARON SPRINGS8431 ft.NN
NIOBRARA8474 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/21/2023                Interval Top: 8861 ft.    Interval Bottom: 18491 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/11/2023Treatment End Date:8/23/2023
Treatment Summary:Frac'd Niobrara with 54 stage plug and perf; 7281692 total lbs proppant pumped: 1995783 lbs 40/70 mesh and 5285909 lbs 100 mesh; 314610 total bbls fluid pumped: 293178 bbls gelled fluid, 179 bbls recycled water, 20594 bbls fresh water and 659 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):314610Max pressure during treatment (psi):8801
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:54
Total acid used in treatment (bbls):659Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):179Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):20594Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7281692Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8778 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2023Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 311
BBLS_OIL 622
BTU_GAS 1300
CALC_BBLS_H2O 311
CALC_BBLS_OIL 622
CALC_GOR 2378
CALC_MCF_GAS 1479
CASING_PRESS 2455
GRAVITY_OIL 38
MCF_GAS 1479
TUBING_PRESS 1647
Perforation Data:
Interval Top:8861 ft.# Of Holes:3138
Interval Bottom:18491 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17103
Total Gas Produced (MCF)335791
GOR19633
GOR DeterminationMCFE
Average BOE per Day205.960
Average MCFE per Day1194.565

 Federal Financial Assurance  i 

 Tribal Well  i No